基于矩阵的项目规划方法

Zsolt Tibor Kosztyán, J. Kiss
{"title":"基于矩阵的项目规划方法","authors":"Zsolt Tibor Kosztyán, J. Kiss","doi":"10.33225/pmc/11.01.67","DOIUrl":null,"url":null,"abstract":"Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2006; Pritsker, 1966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where IT, innovation or product development are involved. There are some shortcomings when using network planning methods for scheduling these kinds of projects, because these methods cannot handle the importance of the task realizations. They cannot solve the problem, when some tasks have to be left out from the project because of the constraints, or when the completion order of tasks can be different. In this paper new matrix-based project planning methods are introduced which illustrate how all possible solutions can be determined in two steps based on the Project Expert Matrix. Firstly those tasks are selected, which have to be or can be realized during the project. Afterwards the dependencies (the sequence of the chosen tasks) are determined taking the project constraints into account. The possible solutions can be ranked and the most probable solution can be chosen which can be realized within the given constraints. This method can be a useful tool for project managers as a part of an expert system.\nKey words: matrix-based project planning method, Project Expert Graph, Project Expert Matrix, Stochastic Network Planning Method.","PeriodicalId":272134,"journal":{"name":"Problems of Management in the 21st Century","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"MATRIX-BASED PROJECT PLANNING METHODS\",\"authors\":\"Zsolt Tibor Kosztyán, J. Kiss\",\"doi\":\"10.33225/pmc/11.01.67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2006; Pritsker, 1966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where IT, innovation or product development are involved. There are some shortcomings when using network planning methods for scheduling these kinds of projects, because these methods cannot handle the importance of the task realizations. They cannot solve the problem, when some tasks have to be left out from the project because of the constraints, or when the completion order of tasks can be different. In this paper new matrix-based project planning methods are introduced which illustrate how all possible solutions can be determined in two steps based on the Project Expert Matrix. Firstly those tasks are selected, which have to be or can be realized during the project. Afterwards the dependencies (the sequence of the chosen tasks) are determined taking the project constraints into account. The possible solutions can be ranked and the most probable solution can be chosen which can be realized within the given constraints. This method can be a useful tool for project managers as a part of an expert system.\\nKey words: matrix-based project planning method, Project Expert Graph, Project Expert Matrix, Stochastic Network Planning Method.\",\"PeriodicalId\":272134,\"journal\":{\"name\":\"Problems of Management in the 21st Century\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Problems of Management in the 21st Century\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33225/pmc/11.01.67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Problems of Management in the 21st Century","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33225/pmc/11.01.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

项目计划和调度的网络规划方法,包括CPM、PDM、PERT和GERT,已经应用了五十多年(Fondahl, 1961;Fulkerson, 1962;Kelley & Walker, 1959;采购经理人指数(PMI), 2006;Pritsker, 1966),它可以广泛应用于建筑和研发等不同领域的项目规划。然而,这些网络规划方法在涉及IT、创新或产品开发的情况下并不十分适用。使用网络规划方法对这类项目进行调度存在一些不足,因为这些方法不能处理任务实现的重要性。当某些任务由于约束而不得不从项目中被遗漏,或者当任务的完成顺序可能不同时,它们无法解决问题。本文介绍了一种新的基于矩阵的项目规划方法,它说明了如何在项目专家矩阵的基础上分两步确定所有可能的解决方案。首先,选择那些必须或可以在项目期间实现的任务。然后,考虑到项目约束,确定依赖关系(所选任务的顺序)。可以对可能的解决方案进行排序,并选择在给定约束条件下可以实现的最可能的解决方案。作为专家系统的一部分,这种方法对项目经理来说是一个有用的工具。关键词:基于矩阵的项目规划方法,项目专家图,项目专家矩阵,随机网络规划方法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MATRIX-BASED PROJECT PLANNING METHODS
Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, 1961; Fulkerson, 1962; Kelley & Walker, 1959; PMI, 2006; Pritsker, 1966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where IT, innovation or product development are involved. There are some shortcomings when using network planning methods for scheduling these kinds of projects, because these methods cannot handle the importance of the task realizations. They cannot solve the problem, when some tasks have to be left out from the project because of the constraints, or when the completion order of tasks can be different. In this paper new matrix-based project planning methods are introduced which illustrate how all possible solutions can be determined in two steps based on the Project Expert Matrix. Firstly those tasks are selected, which have to be or can be realized during the project. Afterwards the dependencies (the sequence of the chosen tasks) are determined taking the project constraints into account. The possible solutions can be ranked and the most probable solution can be chosen which can be realized within the given constraints. This method can be a useful tool for project managers as a part of an expert system. Key words: matrix-based project planning method, Project Expert Graph, Project Expert Matrix, Stochastic Network Planning Method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信