制造过程中提高装配时间的过程

M. Mazur
{"title":"制造过程中提高装配时间的过程","authors":"M. Mazur","doi":"10.2478/cqpi-2020-0015","DOIUrl":null,"url":null,"abstract":"Abstract The article concerns the analysis of the efficiency of the process of retooling the production line. The analyzes of preparation and implementation of production changes (serial production) are presented. The main issues of technical preparation were included in the analyzes. In addition, the investment indicators and the return of the funds involved were estimated. The work presents justification for undertaking a topic for the analyzed production system. Analyzes of the prosecutions were carried out earlier and a plan for implementing new procedures was created. The analysis of the improvement project takes into account investment opportunities as well as the time of engagement of the working group.","PeriodicalId":166707,"journal":{"name":"Conference Quality Production Improvement – CQPI","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Process of Improving the Set-Up Time in the Manufacturing Process\",\"authors\":\"M. Mazur\",\"doi\":\"10.2478/cqpi-2020-0015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The article concerns the analysis of the efficiency of the process of retooling the production line. The analyzes of preparation and implementation of production changes (serial production) are presented. The main issues of technical preparation were included in the analyzes. In addition, the investment indicators and the return of the funds involved were estimated. The work presents justification for undertaking a topic for the analyzed production system. Analyzes of the prosecutions were carried out earlier and a plan for implementing new procedures was created. The analysis of the improvement project takes into account investment opportunities as well as the time of engagement of the working group.\",\"PeriodicalId\":166707,\"journal\":{\"name\":\"Conference Quality Production Improvement – CQPI\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Quality Production Improvement – CQPI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/cqpi-2020-0015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Quality Production Improvement – CQPI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/cqpi-2020-0015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:本文对生产线改造过程的效率进行了分析。对生产变更(批量生产)的准备和实施进行了分析。对技术准备中的主要问题进行了分析。此外,还对投资指标和所涉及的资金收益进行了估算。该工作提出了为分析的生产系统承担一个主题的理由。早些时候对起诉进行了分析,并制定了执行新程序的计划。改进项目的分析考虑到投资机会以及工作组参与的时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Process of Improving the Set-Up Time in the Manufacturing Process
Abstract The article concerns the analysis of the efficiency of the process of retooling the production line. The analyzes of preparation and implementation of production changes (serial production) are presented. The main issues of technical preparation were included in the analyzes. In addition, the investment indicators and the return of the funds involved were estimated. The work presents justification for undertaking a topic for the analyzed production system. Analyzes of the prosecutions were carried out earlier and a plan for implementing new procedures was created. The analysis of the improvement project takes into account investment opportunities as well as the time of engagement of the working group.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信