电力线结构和电缆结冰超载

R. Velásquez, J. Mejía
{"title":"电力线结构和电缆结冰超载","authors":"R. Velásquez, J. Mejía","doi":"10.1109/TDLA47668.2020.9326194","DOIUrl":null,"url":null,"abstract":"Ice storms and related ice loads on overhead lines could result severe in the power system, if this transmission line is associated to a power plant or urban functioning, specially, if there are not a high voltage ring for reliability. The objective of this research is to propose a new methodology for estimate ice loads due to Andean mountain over 4500 masl, based on international standards, meteorological observational data, national and the best practices for power system construction. The decision about an overhaul or replacement of transmission line systems come with a long-term commitment, \"this is particularly important considering that many researchers predict more intense and more frequent climatic hazard in the future\".","PeriodicalId":448644,"journal":{"name":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Structures in Power lines and ice overload on cables\",\"authors\":\"R. Velásquez, J. Mejía\",\"doi\":\"10.1109/TDLA47668.2020.9326194\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Ice storms and related ice loads on overhead lines could result severe in the power system, if this transmission line is associated to a power plant or urban functioning, specially, if there are not a high voltage ring for reliability. The objective of this research is to propose a new methodology for estimate ice loads due to Andean mountain over 4500 masl, based on international standards, meteorological observational data, national and the best practices for power system construction. The decision about an overhaul or replacement of transmission line systems come with a long-term commitment, \\\"this is particularly important considering that many researchers predict more intense and more frequent climatic hazard in the future\\\".\",\"PeriodicalId\":448644,\"journal\":{\"name\":\"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDLA47668.2020.9326194\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDLA47668.2020.9326194","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

如果这条输电线路与发电厂或城市功能有关,特别是如果没有可靠的高压环,那么在架空线路上的冰暴和相关的冰负荷可能会对电力系统造成严重影响。本研究的目的是基于国际标准、气象观测数据、国家和电力系统建设的最佳实践,提出一种新的估算安第斯山脉冰负荷的方法。关于大修或更换输电线路系统的决定需要一个长期的承诺,“考虑到许多科学家预测未来会有更强烈和更频繁的气候灾害,这一点尤其重要”。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Structures in Power lines and ice overload on cables
Ice storms and related ice loads on overhead lines could result severe in the power system, if this transmission line is associated to a power plant or urban functioning, specially, if there are not a high voltage ring for reliability. The objective of this research is to propose a new methodology for estimate ice loads due to Andean mountain over 4500 masl, based on international standards, meteorological observational data, national and the best practices for power system construction. The decision about an overhaul or replacement of transmission line systems come with a long-term commitment, "this is particularly important considering that many researchers predict more intense and more frequent climatic hazard in the future".
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信