为什么基于位置的调度适用于海上油气建设?

J. Lerche, H. Neve, Kristian Birch Pedersen, S. Wandahl, A. Gross
{"title":"为什么基于位置的调度适用于海上油气建设?","authors":"J. Lerche, H. Neve, Kristian Birch Pedersen, S. Wandahl, A. Gross","doi":"10.24928/2019/0120","DOIUrl":null,"url":null,"abstract":"The focus of this research in testing the applicability of location-based scheduling within the offshore oil and gas construction domain. The case investigated is a larger oil and gas field undergoing refurbishment in the Danish sector of the North Sea. The exploratory case study took a deductive approach by analyzing the existing location-based scheduling literature. The theoretical patterns allow testing the applicability of the theory in the offshore construction domain. Adapting the patterns from the construction context to the offshore oil and gas construction context. With the knowledge of why and how from a theoretical perspective, we analyzed the original oil & gas construction schedule which is based on critical path method. This analysis provides knowledge about how location-based scheduling is applicable from an industrial perspective. This paper contributes knowledge by testing the theory of location-based scheduling in the offshore oil and gas construction context.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?\",\"authors\":\"J. Lerche, H. Neve, Kristian Birch Pedersen, S. Wandahl, A. Gross\",\"doi\":\"10.24928/2019/0120\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The focus of this research in testing the applicability of location-based scheduling within the offshore oil and gas construction domain. The case investigated is a larger oil and gas field undergoing refurbishment in the Danish sector of the North Sea. The exploratory case study took a deductive approach by analyzing the existing location-based scheduling literature. The theoretical patterns allow testing the applicability of the theory in the offshore construction domain. Adapting the patterns from the construction context to the offshore oil and gas construction context. With the knowledge of why and how from a theoretical perspective, we analyzed the original oil & gas construction schedule which is based on critical path method. This analysis provides knowledge about how location-based scheduling is applicable from an industrial perspective. This paper contributes knowledge by testing the theory of location-based scheduling in the offshore oil and gas construction context.\",\"PeriodicalId\":278113,\"journal\":{\"name\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2019/0120\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0120","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本研究的重点是测试基于位置调度在海上油气建设领域的适用性。调查的案例是北海丹麦部分正在翻新的一个较大的油气田。探索性案例研究通过分析现有的基于位置的调度文献,采用演绎的方法。理论模式允许测试理论在海上建设领域的适用性。适应海上油气建设环境的施工模式。从理论的角度分析了基于关键路径法的原有油气施工计划。此分析提供了关于如何从工业角度应用基于位置的调度的知识。本文通过对海上油气施工中基于位置的调度理论进行验证,为海上油气施工提供了理论基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Why Would Location-Based Scheduling Be Applicable for Offshore Oil and Gas Construction?
The focus of this research in testing the applicability of location-based scheduling within the offshore oil and gas construction domain. The case investigated is a larger oil and gas field undergoing refurbishment in the Danish sector of the North Sea. The exploratory case study took a deductive approach by analyzing the existing location-based scheduling literature. The theoretical patterns allow testing the applicability of the theory in the offshore construction domain. Adapting the patterns from the construction context to the offshore oil and gas construction context. With the knowledge of why and how from a theoretical perspective, we analyzed the original oil & gas construction schedule which is based on critical path method. This analysis provides knowledge about how location-based scheduling is applicable from an industrial perspective. This paper contributes knowledge by testing the theory of location-based scheduling in the offshore oil and gas construction context.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信