小组决策支持系统,以确定智能集成系统的项目经理采用模糊Tahani方法

Arif Athallah, Diana Diana
{"title":"小组决策支持系统,以确定智能集成系统的项目经理采用模糊Tahani方法","authors":"Arif Athallah, Diana Diana","doi":"10.47065/josh.v4i3.3373","DOIUrl":null,"url":null,"abstract":"Project is a series of activities carried out within a limited period of time with certain resources to achieve the best results in the future. In a series of activities, the project must have problems or obstacles. The success of the project is influenced by who and how to deal with problems or obstacles during the project. The project manager is the person chosen to be responsible for activities in the project management process for the benefit of the company and is a core figure in the success of a project and is the most influential factor in the success of project management. The obstacle that exists in Smart Integrated System companies is that there is no project manager selection process that implements a requirement to become a project manager. Plus, the role of the project manager is always changing and being chosen on the spur of the moment and randomly. This study aims to overcome problems that may arise in group decision making in Smart Integrated System companies. Solving problems in Smart Integrated System (SIS) company will use a system called a website-based Group Decision Support System (GDSS) that will apply the Fuzzy Tahani method. Admin determines the high Query Fuzzification value for each set of Membership Function criteria / sub-criteria. The results of system testing on four project manager candidates found that a candidate named Jaka has the right to become a project manager. The project manager candidate selected according to the system is the best project manager candidate based on the criteria provided.","PeriodicalId":233506,"journal":{"name":"Journal of Information System Research (JOSH)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Group Decision Support System Untuk Menentukan Manajer Proyek Pada Perusahaan Smart Integrated System Menerapkan Metode Fuzzy Tahani\",\"authors\":\"Arif Athallah, Diana Diana\",\"doi\":\"10.47065/josh.v4i3.3373\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project is a series of activities carried out within a limited period of time with certain resources to achieve the best results in the future. In a series of activities, the project must have problems or obstacles. The success of the project is influenced by who and how to deal with problems or obstacles during the project. The project manager is the person chosen to be responsible for activities in the project management process for the benefit of the company and is a core figure in the success of a project and is the most influential factor in the success of project management. The obstacle that exists in Smart Integrated System companies is that there is no project manager selection process that implements a requirement to become a project manager. Plus, the role of the project manager is always changing and being chosen on the spur of the moment and randomly. This study aims to overcome problems that may arise in group decision making in Smart Integrated System companies. Solving problems in Smart Integrated System (SIS) company will use a system called a website-based Group Decision Support System (GDSS) that will apply the Fuzzy Tahani method. Admin determines the high Query Fuzzification value for each set of Membership Function criteria / sub-criteria. The results of system testing on four project manager candidates found that a candidate named Jaka has the right to become a project manager. The project manager candidate selected according to the system is the best project manager candidate based on the criteria provided.\",\"PeriodicalId\":233506,\"journal\":{\"name\":\"Journal of Information System Research (JOSH)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Information System Research (JOSH)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47065/josh.v4i3.3373\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Information System Research (JOSH)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47065/josh.v4i3.3373","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目是在有限的时间内利用一定的资源进行的一系列活动,目的是在未来取得最好的结果。在一系列活动中,项目必然存在问题或障碍。项目的成功取决于谁以及如何处理项目中的问题或障碍。项目经理是在项目管理过程中为公司利益负责活动的人,是项目成功的核心人物,是项目管理成功的最具影响力的因素。在智能集成系统公司中存在的障碍是,没有项目经理选择过程来实现成为项目经理的要求。此外,项目经理的角色总是在变化,并且是在一时兴起和随机选择的。本研究旨在克服在智能集成系统公司中可能出现的群体决策问题。解决智能集成系统(SIS)公司的问题将使用一种称为基于网站的群体决策支持系统(GDSS)的系统,该系统将应用模糊塔哈尼方法。管理员决定每一组隶属函数标准/子标准的查询模糊化高值。对四位项目经理候选人进行系统测试的结果发现,一位名叫Jaka的候选人有资格成为项目经理。根据系统选出的项目经理候选人是根据所提供的标准选出的最佳项目经理候选人。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Group Decision Support System Untuk Menentukan Manajer Proyek Pada Perusahaan Smart Integrated System Menerapkan Metode Fuzzy Tahani
Project is a series of activities carried out within a limited period of time with certain resources to achieve the best results in the future. In a series of activities, the project must have problems or obstacles. The success of the project is influenced by who and how to deal with problems or obstacles during the project. The project manager is the person chosen to be responsible for activities in the project management process for the benefit of the company and is a core figure in the success of a project and is the most influential factor in the success of project management. The obstacle that exists in Smart Integrated System companies is that there is no project manager selection process that implements a requirement to become a project manager. Plus, the role of the project manager is always changing and being chosen on the spur of the moment and randomly. This study aims to overcome problems that may arise in group decision making in Smart Integrated System companies. Solving problems in Smart Integrated System (SIS) company will use a system called a website-based Group Decision Support System (GDSS) that will apply the Fuzzy Tahani method. Admin determines the high Query Fuzzification value for each set of Membership Function criteria / sub-criteria. The results of system testing on four project manager candidates found that a candidate named Jaka has the right to become a project manager. The project manager candidate selected according to the system is the best project manager candidate based on the criteria provided.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信