{"title":"济州岛风力发电普及率提高对利用系数的影响","authors":"Jin-Woo Park, G. Pyo, S. Moon","doi":"10.1109/PES.2010.5590000","DOIUrl":null,"url":null,"abstract":"Many Korean companies are eager to construct wind farms in Jeju Island, thanks to the Government's policy of supporting renewable energy. Total capacity of planned wind farm is 250MW and government's target is 500MW. At the same time local government of Jeju Island has plans to build new 300MW LNG power plant or 400MW HVDC#2 with mainland. However local power demand of Jeju Island will not be increased largely in near future. Therefore the utilization factors of conventional units are to be decreased significantly. Over construction compare with scale of Jeju power system is worried in this case, it is needed to verify the feasibility of both plans. In this research, the impact on utilization factor of conventional units and HVDC transmission with increased wind power penetration level is presented. And impact of devices planned - LNG, HVDC- is also investigated. The best way for Jeju Island case to increase wind power is presented in this paper.","PeriodicalId":177545,"journal":{"name":"IEEE PES General Meeting","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Impact on utilization factor with increasing wind power penetration level in Jeju Island\",\"authors\":\"Jin-Woo Park, G. Pyo, S. Moon\",\"doi\":\"10.1109/PES.2010.5590000\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many Korean companies are eager to construct wind farms in Jeju Island, thanks to the Government's policy of supporting renewable energy. Total capacity of planned wind farm is 250MW and government's target is 500MW. At the same time local government of Jeju Island has plans to build new 300MW LNG power plant or 400MW HVDC#2 with mainland. However local power demand of Jeju Island will not be increased largely in near future. Therefore the utilization factors of conventional units are to be decreased significantly. Over construction compare with scale of Jeju power system is worried in this case, it is needed to verify the feasibility of both plans. In this research, the impact on utilization factor of conventional units and HVDC transmission with increased wind power penetration level is presented. And impact of devices planned - LNG, HVDC- is also investigated. The best way for Jeju Island case to increase wind power is presented in this paper.\",\"PeriodicalId\":177545,\"journal\":{\"name\":\"IEEE PES General Meeting\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES General Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2010.5590000\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES General Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2010.5590000","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

由于政府支持可再生能源的政策,许多韩国公司都渴望在济州岛建设风力发电场。规划的风电场总容量为250兆瓦,政府的目标是500兆瓦。与此同时,济州岛地方政府计划与大陆新建300兆瓦的LNG发电厂或400兆瓦的HVDC 2号。但是,短期内济州岛的电力需求不会大幅增加。因此,常规机组的利用系数将显著降低。在这种情况下,与济州电力系统的规模相比,令人担忧的是过度建设,有必要对两个计划的可行性进行验证。研究风电穿透水平的提高对常规机组和直流输电利用系数的影响。并对LNG、HVDC等设备的影响进行了研究。以济州岛为例,提出了增加风电的最佳途径。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact on utilization factor with increasing wind power penetration level in Jeju Island
Many Korean companies are eager to construct wind farms in Jeju Island, thanks to the Government's policy of supporting renewable energy. Total capacity of planned wind farm is 250MW and government's target is 500MW. At the same time local government of Jeju Island has plans to build new 300MW LNG power plant or 400MW HVDC#2 with mainland. However local power demand of Jeju Island will not be increased largely in near future. Therefore the utilization factors of conventional units are to be decreased significantly. Over construction compare with scale of Jeju power system is worried in this case, it is needed to verify the feasibility of both plans. In this research, the impact on utilization factor of conventional units and HVDC transmission with increased wind power penetration level is presented. And impact of devices planned - LNG, HVDC- is also investigated. The best way for Jeju Island case to increase wind power is presented in this paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信