通过停机时间和平均停机时间分析评估半自动化制造公司的总生产维护实施情况

Chowdury M. L. Rahman
{"title":"通过停机时间和平均停机时间分析评估半自动化制造公司的总生产维护实施情况","authors":"Chowdury M. L. Rahman","doi":"10.1109/IEOM.2015.7093762","DOIUrl":null,"url":null,"abstract":"Total productive maintenance (TPM) has become one of the most popular maintenance strategies to ensure high machine reliability since it is regarded as an integral part of lean Manufacturing. One of the main objectives of TPM is to increase the overall equipment effectiveness of plant equipment with a modest investment in maintenance. Companies around the world spend a lot of money on buying new machinery to increase the production, however a little is done to get hundred percent output from the machines. Nevertheless, because of increased competition and demand of quality products at lower costs, buying latest equipment is not a solution unless it is fully utilized. Therefore machine maintenance and in particular, implementing an appropriate maintenance strategy has become increasingly important for manufacturing industries to fulfill these requirements. In this regard, this paper has focused on a case-study work with the aim of evaluating the effects of total productive maintenance implementation onto the existing production scenario of a selected semi-automated manufacturing company of Bangladesh by measuring downtime and mean downtime reduction and performing mean downtime analysis (MDT). Pareto analysis and statistical analysis of downtimes have been conducted to identify the most affecting downtime factors hierarchically. According to the results observed, modern maintenance management and production improvement techniques have been suggested to improve the maintenance procedure and at the same time to enhance the volume of production as well.","PeriodicalId":410110,"journal":{"name":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"22","resultStr":"{\"title\":\"Assessment of total productive maintenance implementation in a semiautomated manufacturing company through downtime and mean downtime analysis\",\"authors\":\"Chowdury M. L. Rahman\",\"doi\":\"10.1109/IEOM.2015.7093762\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Total productive maintenance (TPM) has become one of the most popular maintenance strategies to ensure high machine reliability since it is regarded as an integral part of lean Manufacturing. One of the main objectives of TPM is to increase the overall equipment effectiveness of plant equipment with a modest investment in maintenance. Companies around the world spend a lot of money on buying new machinery to increase the production, however a little is done to get hundred percent output from the machines. Nevertheless, because of increased competition and demand of quality products at lower costs, buying latest equipment is not a solution unless it is fully utilized. Therefore machine maintenance and in particular, implementing an appropriate maintenance strategy has become increasingly important for manufacturing industries to fulfill these requirements. In this regard, this paper has focused on a case-study work with the aim of evaluating the effects of total productive maintenance implementation onto the existing production scenario of a selected semi-automated manufacturing company of Bangladesh by measuring downtime and mean downtime reduction and performing mean downtime analysis (MDT). Pareto analysis and statistical analysis of downtimes have been conducted to identify the most affecting downtime factors hierarchically. According to the results observed, modern maintenance management and production improvement techniques have been suggested to improve the maintenance procedure and at the same time to enhance the volume of production as well.\",\"PeriodicalId\":410110,\"journal\":{\"name\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"22\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEOM.2015.7093762\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEOM.2015.7093762","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 22

摘要

全面生产维护(TPM)作为精益制造的重要组成部分,已成为保证机器高可靠性的最流行的维护策略之一。TPM的主要目标之一是通过适度的维护投资来提高工厂设备的整体设备效率。世界各地的公司花很多钱购买新机器来增加产量,但是要从机器中获得100%的产量却做得很少。然而,由于竞争加剧和对低成本高质量产品的需求,除非充分利用最新设备,否则购买最新设备不是解决办法。因此,机器维护,特别是实施适当的维护策略对于制造业满足这些要求变得越来越重要。在这方面,本文侧重于一个案例研究工作,目的是通过测量停机时间和平均停机时间减少以及执行平均停机时间分析(MDT),评估全面生产性维护实施对孟加拉国一家选定的半自动化制造公司现有生产场景的影响。对停机时间进行了帕累托分析和统计分析,分层次确定了影响停机时间最大的因素。根据观察结果,提出了现代维修管理和生产改进技术,以改善维修程序,同时提高产量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of total productive maintenance implementation in a semiautomated manufacturing company through downtime and mean downtime analysis
Total productive maintenance (TPM) has become one of the most popular maintenance strategies to ensure high machine reliability since it is regarded as an integral part of lean Manufacturing. One of the main objectives of TPM is to increase the overall equipment effectiveness of plant equipment with a modest investment in maintenance. Companies around the world spend a lot of money on buying new machinery to increase the production, however a little is done to get hundred percent output from the machines. Nevertheless, because of increased competition and demand of quality products at lower costs, buying latest equipment is not a solution unless it is fully utilized. Therefore machine maintenance and in particular, implementing an appropriate maintenance strategy has become increasingly important for manufacturing industries to fulfill these requirements. In this regard, this paper has focused on a case-study work with the aim of evaluating the effects of total productive maintenance implementation onto the existing production scenario of a selected semi-automated manufacturing company of Bangladesh by measuring downtime and mean downtime reduction and performing mean downtime analysis (MDT). Pareto analysis and statistical analysis of downtimes have been conducted to identify the most affecting downtime factors hierarchically. According to the results observed, modern maintenance management and production improvement techniques have been suggested to improve the maintenance procedure and at the same time to enhance the volume of production as well.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信