PANDeMOO:基于多目标优化的电力线通信接入网设计器

A. Haidine, I. Mellado, R. Lehnert
{"title":"PANDeMOO:基于多目标优化的电力线通信接入网设计器","authors":"A. Haidine, I. Mellado, R. Lehnert","doi":"10.1109/ISPLC.2005.1430479","DOIUrl":null,"url":null,"abstract":"In this work, we investigate the problems related to the planning of the broadband powerline communications (B-PLC) access network. This design problem is subdivided into two main optimization parts; namely the generalized base station placement (GBSP) problem and the PLC channels allocation problem (CAP). These two problems are considered as multi-objective optimization problems; therefore, they are solved through different possible multi-optimization algorithms (MOA). The investigated MOAs and other required modules are implemented in a planning tool, which is designed for the planning of the B-PLC access networks and therefore it is called PANDeMOO (powerline communications access networks designer based on multi-objective optimization).","PeriodicalId":153251,"journal":{"name":"International Symposium on Power Line Communications and Its Applications, 2005.","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"PANDeMOO: a powerline communications access network designer based on multi-objective optimization\",\"authors\":\"A. Haidine, I. Mellado, R. Lehnert\",\"doi\":\"10.1109/ISPLC.2005.1430479\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this work, we investigate the problems related to the planning of the broadband powerline communications (B-PLC) access network. This design problem is subdivided into two main optimization parts; namely the generalized base station placement (GBSP) problem and the PLC channels allocation problem (CAP). These two problems are considered as multi-objective optimization problems; therefore, they are solved through different possible multi-optimization algorithms (MOA). The investigated MOAs and other required modules are implemented in a planning tool, which is designed for the planning of the B-PLC access networks and therefore it is called PANDeMOO (powerline communications access networks designer based on multi-objective optimization).\",\"PeriodicalId\":153251,\"journal\":{\"name\":\"International Symposium on Power Line Communications and Its Applications, 2005.\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium on Power Line Communications and Its Applications, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPLC.2005.1430479\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Power Line Communications and Its Applications, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPLC.2005.1430479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

在这项工作中,我们研究了宽带电力线通信(B-PLC)接入网的规划问题。本设计问题主要分为两个优化部分;即广义基站布局问题(GBSP)和PLC信道分配问题(CAP)。这两个问题被认为是多目标优化问题;因此,它们通过不同可能的多优化算法(MOA)来求解。所研究的moa和其他所需模块在规划工具中实现,该工具专为B-PLC接入网规划而设计,因此被称为PANDeMOO(基于多目标优化的电力线通信接入网设计器)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
PANDeMOO: a powerline communications access network designer based on multi-objective optimization
In this work, we investigate the problems related to the planning of the broadband powerline communications (B-PLC) access network. This design problem is subdivided into two main optimization parts; namely the generalized base station placement (GBSP) problem and the PLC channels allocation problem (CAP). These two problems are considered as multi-objective optimization problems; therefore, they are solved through different possible multi-optimization algorithms (MOA). The investigated MOAs and other required modules are implemented in a planning tool, which is designed for the planning of the B-PLC access networks and therefore it is called PANDeMOO (powerline communications access networks designer based on multi-objective optimization).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信