利用无人机系统和4D BIM进行施工进度监控

J. S. Álvares, D. Costa
{"title":"利用无人机系统和4D BIM进行施工进度监控","authors":"J. S. Álvares, D. Costa","doi":"10.24928/2019/0165","DOIUrl":null,"url":null,"abstract":"Construction progress monitoring may help for an efficient management process as planned. Studies have proposed the use of visual data technologies; however, little has yet been done for the development and implementation of methods for integrating such technologies into construction management routine. This study aims to implement and evaluate the proposed method for systematic visual progress monitoring integrating into the production planning and control process, supported by 4D BIM, photogrammetric 3D mapping using Unmanned Arial System imagery, and performance indicators. The proposed method was implemented for 20 weeks in a case study on a construction project. The data collection included construction site 3D mapping generation, visual comparison of 4D BIM and 3D mapping status, measurement of performance indicators, and structured interviews. The evaluation focused on the following research constructs: compliance with the planned goals, impact on the construction progress deviations, transparency, and collaboration. The main findings indicate an improved integration of progress analysis and decision-making, improvement of progress deviations’ identification, and allowed for better compliance with planned goals and increased transparency and collaboration. The main contribution of this work is a better understanding of the impact and added value of the new information flow provided by using the proposed method.","PeriodicalId":278113,"journal":{"name":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":"{\"title\":\"Construction Progress Monitoring Using Unmanned Aerial System and 4D BIM\",\"authors\":\"J. S. Álvares, D. Costa\",\"doi\":\"10.24928/2019/0165\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction progress monitoring may help for an efficient management process as planned. Studies have proposed the use of visual data technologies; however, little has yet been done for the development and implementation of methods for integrating such technologies into construction management routine. This study aims to implement and evaluate the proposed method for systematic visual progress monitoring integrating into the production planning and control process, supported by 4D BIM, photogrammetric 3D mapping using Unmanned Arial System imagery, and performance indicators. The proposed method was implemented for 20 weeks in a case study on a construction project. The data collection included construction site 3D mapping generation, visual comparison of 4D BIM and 3D mapping status, measurement of performance indicators, and structured interviews. The evaluation focused on the following research constructs: compliance with the planned goals, impact on the construction progress deviations, transparency, and collaboration. The main findings indicate an improved integration of progress analysis and decision-making, improvement of progress deviations’ identification, and allowed for better compliance with planned goals and increased transparency and collaboration. The main contribution of this work is a better understanding of the impact and added value of the new information flow provided by using the proposed method.\",\"PeriodicalId\":278113,\"journal\":{\"name\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2019/0165\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2019/0165","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

摘要

施工进度监测有助于按计划进行有效的管理过程。研究建议使用视觉数据技术;但是,在发展和执行将这些技术纳入建筑管理日常工作的方法方面还做得很少。本研究旨在实施和评估所提出的集成到生产计划和控制过程的系统视觉进度监控方法,该方法以4D BIM、使用Unmanned Arial System图像的摄影测量3D测绘和绩效指标为支持。该方法在一个建筑项目的案例研究中实施了20周。数据收集包括施工现场三维制图生成、4D BIM与三维制图状态可视化对比、绩效指标测量、结构化访谈等。评估集中在以下研究结构上:对计划目标的遵从性,对施工进度偏差的影响,透明度和协作。主要发现表明,改进了进度分析和决策的整合,改进了进度偏差的识别,并允许更好地遵守计划目标,增加了透明度和协作。这项工作的主要贡献是更好地理解使用所提出的方法所提供的新信息流的影响和附加价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Construction Progress Monitoring Using Unmanned Aerial System and 4D BIM
Construction progress monitoring may help for an efficient management process as planned. Studies have proposed the use of visual data technologies; however, little has yet been done for the development and implementation of methods for integrating such technologies into construction management routine. This study aims to implement and evaluate the proposed method for systematic visual progress monitoring integrating into the production planning and control process, supported by 4D BIM, photogrammetric 3D mapping using Unmanned Arial System imagery, and performance indicators. The proposed method was implemented for 20 weeks in a case study on a construction project. The data collection included construction site 3D mapping generation, visual comparison of 4D BIM and 3D mapping status, measurement of performance indicators, and structured interviews. The evaluation focused on the following research constructs: compliance with the planned goals, impact on the construction progress deviations, transparency, and collaboration. The main findings indicate an improved integration of progress analysis and decision-making, improvement of progress deviations’ identification, and allowed for better compliance with planned goals and increased transparency and collaboration. The main contribution of this work is a better understanding of the impact and added value of the new information flow provided by using the proposed method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信