{"title":"一种用于不同订单生产调度的优化方法","authors":"W. Liao, Tong Wang","doi":"10.1109/ICITM.2018.8333953","DOIUrl":null,"url":null,"abstract":"Aiming at the production scheduling problem of many varieties and small quantities, this paper designs an optimization model of production scheduling that considered equipment failures, which makes production scheduling more in line with actual processing. Firstly, assumed that the equipment failure rate obeys Weibull distribution. The sum of equipment maintenance cost, labor cost and part processing cost is the cost of production scheduling. The optimization model is established by minimizing the makespan and minimizing the cost of production scheduling; Secondly, genetic algorithm is improved by adding a cloud model generator. Then designed the process of how to use improved genetic algorithm to solve the job shop scheduling problem considering machine failure; Finally, select the case, verify the design of the model and algorithm, the calculation results show that the model and algorithm proposed in this paper has certain practical value.","PeriodicalId":341512,"journal":{"name":"2018 7th International Conference on Industrial Technology and Management (ICITM)","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An optimization approach using in production scheduling with different order\",\"authors\":\"W. Liao, Tong Wang\",\"doi\":\"10.1109/ICITM.2018.8333953\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the production scheduling problem of many varieties and small quantities, this paper designs an optimization model of production scheduling that considered equipment failures, which makes production scheduling more in line with actual processing. Firstly, assumed that the equipment failure rate obeys Weibull distribution. The sum of equipment maintenance cost, labor cost and part processing cost is the cost of production scheduling. The optimization model is established by minimizing the makespan and minimizing the cost of production scheduling; Secondly, genetic algorithm is improved by adding a cloud model generator. Then designed the process of how to use improved genetic algorithm to solve the job shop scheduling problem considering machine failure; Finally, select the case, verify the design of the model and algorithm, the calculation results show that the model and algorithm proposed in this paper has certain practical value.\",\"PeriodicalId\":341512,\"journal\":{\"name\":\"2018 7th International Conference on Industrial Technology and Management (ICITM)\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 7th International Conference on Industrial Technology and Management (ICITM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITM.2018.8333953\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 7th International Conference on Industrial Technology and Management (ICITM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITM.2018.8333953","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

针对多品种、小批量的生产调度问题,设计了考虑设备故障的生产调度优化模型,使生产调度更符合实际加工。首先,假设设备故障率服从威布尔分布。设备维护成本、人工成本和零件加工成本的总和就是生产调度成本。以最大完工时间和最大生产调度成本为目标,建立了优化模型;其次,通过增加云模型生成器对遗传算法进行改进;然后设计了利用改进遗传算法求解考虑机器故障的作业车间调度问题的过程;最后,选取实例,对所设计的模型和算法进行验证,计算结果表明本文所提出的模型和算法具有一定的实用价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An optimization approach using in production scheduling with different order
Aiming at the production scheduling problem of many varieties and small quantities, this paper designs an optimization model of production scheduling that considered equipment failures, which makes production scheduling more in line with actual processing. Firstly, assumed that the equipment failure rate obeys Weibull distribution. The sum of equipment maintenance cost, labor cost and part processing cost is the cost of production scheduling. The optimization model is established by minimizing the makespan and minimizing the cost of production scheduling; Secondly, genetic algorithm is improved by adding a cloud model generator. Then designed the process of how to use improved genetic algorithm to solve the job shop scheduling problem considering machine failure; Finally, select the case, verify the design of the model and algorithm, the calculation results show that the model and algorithm proposed in this paper has certain practical value.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信