农村公路合同管理实践中的低效问题研究

S. Bhattarai
{"title":"农村公路合同管理实践中的低效问题研究","authors":"S. Bhattarai","doi":"10.24321/2393.8307.202105","DOIUrl":null,"url":null,"abstract":"The objective of the research is to identify the inefficiencies in contract management practice in the SNRTP sub-projects and also the sources of these inefficiencies will try to find the probable solutions. To study the inefficiencies in contract management practice in SNRTP rural road projects, the checklist was prepared and data regarding the contract management were obtained with the project stakeholders. The data were collected using questionnaires, analysed using SPSS software, MS Excel and presented using the graph, table, and charts.The findings of the study showed that there are significant inefficiencies in contract management practice in the SNRTP project. It has been found that the majority of the respondents i.e. 79 percent of the experts interviewed opined that there are inefficiencies in the contract management practices in the rural road under SNRTP sub-projects, and only 21 percent think that the process is efficient from questionnaire survey. This has been statistically verified through descriptive statistics. The reason behind the inefficiencies in Contract Management Practice is mainly due to a lack of qualifications, knowledge, skills & experience of the contract management team, lack of cooperation & proper communication between project team member, lack of monitoring & evaluation in time, lack of timely meetings, slow decisions making, and improper planning & poor site management during the construction work. To overcome those inefficiencies some suggestions have been recommended as appointing the team member with proper qualifications, knowledge, skills & experience in the contract management. Proper communication & cooperation between team member, frequent inspection, monitoring and evaluation, completion of work within intended completion time, proper record keeping & timely issue management, and timely decision making from all stakeholders as required in construction work during the project implementation phase.","PeriodicalId":402805,"journal":{"name":"Journal of Advanced Research in Civil and Environmental Engineering","volume":"136 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study of Inefficiencies in Contract Management Practice in Rural Road\",\"authors\":\"S. Bhattarai\",\"doi\":\"10.24321/2393.8307.202105\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of the research is to identify the inefficiencies in contract management practice in the SNRTP sub-projects and also the sources of these inefficiencies will try to find the probable solutions. To study the inefficiencies in contract management practice in SNRTP rural road projects, the checklist was prepared and data regarding the contract management were obtained with the project stakeholders. The data were collected using questionnaires, analysed using SPSS software, MS Excel and presented using the graph, table, and charts.The findings of the study showed that there are significant inefficiencies in contract management practice in the SNRTP project. It has been found that the majority of the respondents i.e. 79 percent of the experts interviewed opined that there are inefficiencies in the contract management practices in the rural road under SNRTP sub-projects, and only 21 percent think that the process is efficient from questionnaire survey. This has been statistically verified through descriptive statistics. The reason behind the inefficiencies in Contract Management Practice is mainly due to a lack of qualifications, knowledge, skills & experience of the contract management team, lack of cooperation & proper communication between project team member, lack of monitoring & evaluation in time, lack of timely meetings, slow decisions making, and improper planning & poor site management during the construction work. To overcome those inefficiencies some suggestions have been recommended as appointing the team member with proper qualifications, knowledge, skills & experience in the contract management. Proper communication & cooperation between team member, frequent inspection, monitoring and evaluation, completion of work within intended completion time, proper record keeping & timely issue management, and timely decision making from all stakeholders as required in construction work during the project implementation phase.\",\"PeriodicalId\":402805,\"journal\":{\"name\":\"Journal of Advanced Research in Civil and Environmental Engineering\",\"volume\":\"136 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Research in Civil and Environmental Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24321/2393.8307.202105\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Research in Civil and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24321/2393.8307.202105","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本研究的目的是确定SNRTP子项目合同管理实践中的低效率,以及这些低效率的来源,并试图找到可能的解决方案。为了研究SNRTP农村公路项目合同管理实践中的低效率问题,我们编制了清单,并从项目利益相关者那里获得了合同管理方面的数据。采用问卷调查的方式收集数据,使用SPSS软件、MS Excel进行分析,并采用图形、表格、图表的形式呈现。研究结果表明,SNRTP项目在合同管理实践中存在显著的低效率。问卷调查发现,大多数受访者,即79%的受访专家认为SNRTP子项目下的农村公路合同管理实践效率低下,只有21%的人认为该过程是有效的。这已经通过描述性统计得到了统计验证。合同管理实践效率低下的原因主要是由于合同管理团队的资质、知识、技能和经验不足,项目组成员之间缺乏合作和沟通,缺乏及时的监测和评估,缺乏及时的会议,决策缓慢,施工过程中规划不当和现场管理不善。为了克服这些效率低下的问题,建议任命在合同管理方面具有适当资格、知识、技能和经验的团队成员。在项目实施阶段,团队成员之间的良好沟通与合作,经常检查、监测和评估,在预期完工时间内完成工作,妥善保存记录并及时管理问题,及时做出各利益相关方在施工工作中的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study of Inefficiencies in Contract Management Practice in Rural Road
The objective of the research is to identify the inefficiencies in contract management practice in the SNRTP sub-projects and also the sources of these inefficiencies will try to find the probable solutions. To study the inefficiencies in contract management practice in SNRTP rural road projects, the checklist was prepared and data regarding the contract management were obtained with the project stakeholders. The data were collected using questionnaires, analysed using SPSS software, MS Excel and presented using the graph, table, and charts.The findings of the study showed that there are significant inefficiencies in contract management practice in the SNRTP project. It has been found that the majority of the respondents i.e. 79 percent of the experts interviewed opined that there are inefficiencies in the contract management practices in the rural road under SNRTP sub-projects, and only 21 percent think that the process is efficient from questionnaire survey. This has been statistically verified through descriptive statistics. The reason behind the inefficiencies in Contract Management Practice is mainly due to a lack of qualifications, knowledge, skills & experience of the contract management team, lack of cooperation & proper communication between project team member, lack of monitoring & evaluation in time, lack of timely meetings, slow decisions making, and improper planning & poor site management during the construction work. To overcome those inefficiencies some suggestions have been recommended as appointing the team member with proper qualifications, knowledge, skills & experience in the contract management. Proper communication & cooperation between team member, frequent inspection, monitoring and evaluation, completion of work within intended completion time, proper record keeping & timely issue management, and timely decision making from all stakeholders as required in construction work during the project implementation phase.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信