一种研究电力市场竞争的高效电力池模拟器

G. Shrestha, S. Kai, L. Goel
{"title":"一种研究电力市场竞争的高效电力池模拟器","authors":"G. Shrestha, S. Kai, L. Goel","doi":"10.1109/PESW.2000.850159","DOIUrl":null,"url":null,"abstract":"With the deregulation of the power industries in many countries, the trend is towards accommodating more freedom and choice to the market participants and encouraging competition as much as possible in the power market. This paper presents the development of a power pool simulation system, which incorporates the features that give more choices and freedom to the market participants and induce greater competition. Important features of the simulation system are discussed. Some issues pertaining to the effects of the bidding data submitted by power suppliers on their benefits, and on the system operation are addressed and analyzed. It is expected that under the competitive market, power suppliers will achieve their cost recovery and optimize their benefits themselves by adjusting their bidding data.","PeriodicalId":286352,"journal":{"name":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-01-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"An efficient power pool simulator for the study of competitive power market\",\"authors\":\"G. Shrestha, S. Kai, L. Goel\",\"doi\":\"10.1109/PESW.2000.850159\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the deregulation of the power industries in many countries, the trend is towards accommodating more freedom and choice to the market participants and encouraging competition as much as possible in the power market. This paper presents the development of a power pool simulation system, which incorporates the features that give more choices and freedom to the market participants and induce greater competition. Important features of the simulation system are discussed. Some issues pertaining to the effects of the bidding data submitted by power suppliers on their benefits, and on the system operation are addressed and analyzed. It is expected that under the competitive market, power suppliers will achieve their cost recovery and optimize their benefits themselves by adjusting their bidding data.\",\"PeriodicalId\":286352,\"journal\":{\"name\":\"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-01-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESW.2000.850159\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESW.2000.850159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

随着许多国家对电力行业的放松管制,电力市场的趋势是为市场参与者提供更多的自由和选择,并尽可能地鼓励竞争。本文介绍了一个电力池仿真系统的开发,该系统具有给市场参与者更多选择和自由,诱导更大竞争的特点。讨论了仿真系统的重要特性。讨论和分析了电力供应商提交的投标数据对其利益和系统运行的影响。期望在竞争市场下,电力供应商通过调整投标数据实现自身的成本回收和效益优化。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An efficient power pool simulator for the study of competitive power market
With the deregulation of the power industries in many countries, the trend is towards accommodating more freedom and choice to the market participants and encouraging competition as much as possible in the power market. This paper presents the development of a power pool simulation system, which incorporates the features that give more choices and freedom to the market participants and induce greater competition. Important features of the simulation system are discussed. Some issues pertaining to the effects of the bidding data submitted by power suppliers on their benefits, and on the system operation are addressed and analyzed. It is expected that under the competitive market, power suppliers will achieve their cost recovery and optimize their benefits themselves by adjusting their bidding data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信