{"title":"奥斯汀能源建立更强大的分配系统,成本有效,与钢杆","authors":"J. Padavick","doi":"10.1109/TDCLLM.2006.340746","DOIUrl":null,"url":null,"abstract":"This is a case study discussion. In the mid-1990s, Austin Energy did a field test with steel distribution poles when looking for a cost-effective solution to a technical distribution problem. This positive experience convinced the Texas municipal utility to use steel in other applications. Today, 90 percent of all new major power distribution projects include steel poles. The paper also reviews the cost analysis, which confirms that Austin Energy has saved time and money with steel while increasing its system's reliability.","PeriodicalId":193517,"journal":{"name":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Austin Energy Builds Stronger Distribution System , Cost Effectively, with Steel Poles\",\"authors\":\"J. Padavick\",\"doi\":\"10.1109/TDCLLM.2006.340746\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This is a case study discussion. In the mid-1990s, Austin Energy did a field test with steel distribution poles when looking for a cost-effective solution to a technical distribution problem. This positive experience convinced the Texas municipal utility to use steel in other applications. Today, 90 percent of all new major power distribution projects include steel poles. The paper also reviews the cost analysis, which confirms that Austin Energy has saved time and money with steel while increasing its system's reliability.\",\"PeriodicalId\":193517,\"journal\":{\"name\":\"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.2006.340746\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.2006.340746","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Austin Energy Builds Stronger Distribution System , Cost Effectively, with Steel Poles
This is a case study discussion. In the mid-1990s, Austin Energy did a field test with steel distribution poles when looking for a cost-effective solution to a technical distribution problem. This positive experience convinced the Texas municipal utility to use steel in other applications. Today, 90 percent of all new major power distribution projects include steel poles. The paper also reviews the cost analysis, which confirms that Austin Energy has saved time and money with steel while increasing its system's reliability.