{"title":"设计错误和性能缺陷可能导致音乐厅天花板坍塌","authors":"R. Chmielewski, L. Kruszka","doi":"10.3846/mbmst.2019.123","DOIUrl":null,"url":null,"abstract":"The issue presented concerns the proper assessment of a ceiling underneath a modernised concert hall in a\nhistoric building as a case study. The reason for a reconstruction was to replace a wood block floor with stone slab floor\nmade of marble. Shortly after the construction works, cracks which appeared, made the floor unsuitable for further use.\nIn order to determine the cause of the damage, a detailed analysis of a state of the construction was performed within\nthe technical diagnostics. The first element that was inspected was the way the cracks were distributed. This layout was\ntypical for overloading of ceiling. It was assumed that the thickness of the concrete overlay of the Ackerman floor was\n9 cm. In order to verify the actual layout of the floor layers, five different opencast works were taken from the top level\nof the floor cavity blocks. The actual layout of the uncovered parts differed from both the assumptions that were made\nand the new design. The arrangement of the floor layers that differed from the design documents, caused the overloading\nof the supporting structure of the Ackerman floor. Additionally, an incorrect design assumption has overlapped.","PeriodicalId":169478,"journal":{"name":"The proceedings of the 13th international conference \"Modern Building Materials, Structures and Techniques\" (MBMST 2019)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design errors and performance defects as causes of the risk for a collapse of the ceiling of the concert hall\",\"authors\":\"R. Chmielewski, L. Kruszka\",\"doi\":\"10.3846/mbmst.2019.123\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The issue presented concerns the proper assessment of a ceiling underneath a modernised concert hall in a\\nhistoric building as a case study. The reason for a reconstruction was to replace a wood block floor with stone slab floor\\nmade of marble. Shortly after the construction works, cracks which appeared, made the floor unsuitable for further use.\\nIn order to determine the cause of the damage, a detailed analysis of a state of the construction was performed within\\nthe technical diagnostics. The first element that was inspected was the way the cracks were distributed. This layout was\\ntypical for overloading of ceiling. It was assumed that the thickness of the concrete overlay of the Ackerman floor was\\n9 cm. In order to verify the actual layout of the floor layers, five different opencast works were taken from the top level\\nof the floor cavity blocks. The actual layout of the uncovered parts differed from both the assumptions that were made\\nand the new design. The arrangement of the floor layers that differed from the design documents, caused the overloading\\nof the supporting structure of the Ackerman floor. Additionally, an incorrect design assumption has overlapped.\",\"PeriodicalId\":169478,\"journal\":{\"name\":\"The proceedings of the 13th international conference \\\"Modern Building Materials, Structures and Techniques\\\" (MBMST 2019)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The proceedings of the 13th international conference \\\"Modern Building Materials, Structures and Techniques\\\" (MBMST 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3846/mbmst.2019.123\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The proceedings of the 13th international conference \"Modern Building Materials, Structures and Techniques\" (MBMST 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3846/mbmst.2019.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Design errors and performance defects as causes of the risk for a collapse of the ceiling of the concert hall
The issue presented concerns the proper assessment of a ceiling underneath a modernised concert hall in a
historic building as a case study. The reason for a reconstruction was to replace a wood block floor with stone slab floor
made of marble. Shortly after the construction works, cracks which appeared, made the floor unsuitable for further use.
In order to determine the cause of the damage, a detailed analysis of a state of the construction was performed within
the technical diagnostics. The first element that was inspected was the way the cracks were distributed. This layout was
typical for overloading of ceiling. It was assumed that the thickness of the concrete overlay of the Ackerman floor was
9 cm. In order to verify the actual layout of the floor layers, five different opencast works were taken from the top level
of the floor cavity blocks. The actual layout of the uncovered parts differed from both the assumptions that were made
and the new design. The arrangement of the floor layers that differed from the design documents, caused the overloading
of the supporting structure of the Ackerman floor. Additionally, an incorrect design assumption has overlapped.