{"title":"基于逻辑概率模型的联网计算机锅炉房安全监控及风险评估","authors":"M. V. Sheptunov","doi":"10.32686/1812-5220-2018-15-80-91","DOIUrl":null,"url":null,"abstract":"We consider one of the existing technologies, scilicet of the multi-shift safety monitoring, which implies tracking of the integrity of the information system (IS) by periodically replacing each other operators in the interval between diagnostics of the system, in relation to computerized boiler-rooms with network access. Herein the IS of the boiler-house is taken into account as protected from dangerous software-engineering influences through the computer network only if to the beginning of the specified period of time the integrity of the system is ensured and throughout this set period the sources of danger do not penetrate the system (with a calculated probability). Here the operator of the boiler-room figures as an eventual link of the series of the controlled, including the program level, barriers for (external) network malefactor. For computerized boiler-houses, depending on the ratios for the duration of the operator’s work during each shift, the specified period of safe operation and the period between diagnostics, three variants are considered that are typical for this technology. The possibilities of applying the latter in the foreshortening of risk assessment of emergency situations (ES) within the previously developed by the author logical-probabilistic model for computerized boiler-houses are discussed.","PeriodicalId":391677,"journal":{"name":"Issues of Risk Analysis","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-01-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Security monitoring of computerized boiler rooms with network access and risk assessment on a logicalprobabilistic model\",\"authors\":\"M. V. Sheptunov\",\"doi\":\"10.32686/1812-5220-2018-15-80-91\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider one of the existing technologies, scilicet of the multi-shift safety monitoring, which implies tracking of the integrity of the information system (IS) by periodically replacing each other operators in the interval between diagnostics of the system, in relation to computerized boiler-rooms with network access. Herein the IS of the boiler-house is taken into account as protected from dangerous software-engineering influences through the computer network only if to the beginning of the specified period of time the integrity of the system is ensured and throughout this set period the sources of danger do not penetrate the system (with a calculated probability). Here the operator of the boiler-room figures as an eventual link of the series of the controlled, including the program level, barriers for (external) network malefactor. For computerized boiler-houses, depending on the ratios for the duration of the operator’s work during each shift, the specified period of safe operation and the period between diagnostics, three variants are considered that are typical for this technology. The possibilities of applying the latter in the foreshortening of risk assessment of emergency situations (ES) within the previously developed by the author logical-probabilistic model for computerized boiler-houses are discussed.\",\"PeriodicalId\":391677,\"journal\":{\"name\":\"Issues of Risk Analysis\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-01-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Issues of Risk Analysis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32686/1812-5220-2018-15-80-91\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Issues of Risk Analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32686/1812-5220-2018-15-80-91","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

我们考虑了一种现有的技术,即多班次安全监测技术,它意味着通过在系统诊断间隔内定期更换其他操作员来跟踪信息系统(IS)的完整性,这与具有网络接入的计算机化锅炉房有关。在这里,只有在规定的时间段开始时,系统的完整性得到保证,并且在整个设定的时间段内,危险源没有渗透到系统中(以计算的概率),锅炉房的IS才被考虑为通过计算机网络免受危险的软件工程影响。这里的操作员将锅炉房的数字作为一系列被控制的最终环节,包括程序层面,对(外部)网络罪犯的障碍。对于计算机化的锅炉房,根据操作员在每班工作时间的比率,规定的安全操作时间和诊断间隔时间,可以考虑三种变体,这是该技术的典型。讨论了在作者先前开发的计算机化锅炉房逻辑-概率模型中,将后者应用于紧急情况风险评估(ES)的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Security monitoring of computerized boiler rooms with network access and risk assessment on a logicalprobabilistic model
We consider one of the existing technologies, scilicet of the multi-shift safety monitoring, which implies tracking of the integrity of the information system (IS) by periodically replacing each other operators in the interval between diagnostics of the system, in relation to computerized boiler-rooms with network access. Herein the IS of the boiler-house is taken into account as protected from dangerous software-engineering influences through the computer network only if to the beginning of the specified period of time the integrity of the system is ensured and throughout this set period the sources of danger do not penetrate the system (with a calculated probability). Here the operator of the boiler-room figures as an eventual link of the series of the controlled, including the program level, barriers for (external) network malefactor. For computerized boiler-houses, depending on the ratios for the duration of the operator’s work during each shift, the specified period of safe operation and the period between diagnostics, three variants are considered that are typical for this technology. The possibilities of applying the latter in the foreshortening of risk assessment of emergency situations (ES) within the previously developed by the author logical-probabilistic model for computerized boiler-houses are discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信