Yinglu Zhou, Hui Fang, Ke Zhao, Ruilin Xu, Xiaojun Zhu, Y. Chi, Yan Xu, Pei Zhang
{"title":"基于Morris筛选法的风电系统无功规划候选母线选择方法","authors":"Yinglu Zhou, Hui Fang, Ke Zhao, Ruilin Xu, Xiaojun Zhu, Y. Chi, Yan Xu, Pei Zhang","doi":"10.1109/EI247390.2019.9061879","DOIUrl":null,"url":null,"abstract":"Candidate bus is a critical determinant of an effective and economical VAR planning. This paper proposes a novel candidate bus selection method based on Latin hypercube Sampling based Morris Screening Method, aiming to identifying the most efficient and effective buses as the candidate buses for VAR planning. Wind power uncertainties and the load dynamics are considered in this method, which makes the proposed method more practical. Complex load model is also considered in this paper to address the adverse impact of the induction motor loads on the power system. Cases studies are carried out on the New England 39-bus test system. Time- domain simulation results obtained from PSS®E demonstrate that the proposed method is effective with acceptable computation complexity.","PeriodicalId":321655,"journal":{"name":"2019 IEEE 3rd Conference on Energy Internet and Energy System Integration (EI2)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Candidate Bus Selection Method for VAR planning of Wind-penetrated Power System based on Morris Screening Method\",\"authors\":\"Yinglu Zhou, Hui Fang, Ke Zhao, Ruilin Xu, Xiaojun Zhu, Y. Chi, Yan Xu, Pei Zhang\",\"doi\":\"10.1109/EI247390.2019.9061879\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Candidate bus is a critical determinant of an effective and economical VAR planning. This paper proposes a novel candidate bus selection method based on Latin hypercube Sampling based Morris Screening Method, aiming to identifying the most efficient and effective buses as the candidate buses for VAR planning. Wind power uncertainties and the load dynamics are considered in this method, which makes the proposed method more practical. Complex load model is also considered in this paper to address the adverse impact of the induction motor loads on the power system. Cases studies are carried out on the New England 39-bus test system. Time- domain simulation results obtained from PSS®E demonstrate that the proposed method is effective with acceptable computation complexity.\",\"PeriodicalId\":321655,\"journal\":{\"name\":\"2019 IEEE 3rd Conference on Energy Internet and Energy System Integration (EI2)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE 3rd Conference on Energy Internet and Energy System Integration (EI2)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EI247390.2019.9061879\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 3rd Conference on Energy Internet and Energy System Integration (EI2)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EI247390.2019.9061879","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Candidate Bus Selection Method for VAR planning of Wind-penetrated Power System based on Morris Screening Method
Candidate bus is a critical determinant of an effective and economical VAR planning. This paper proposes a novel candidate bus selection method based on Latin hypercube Sampling based Morris Screening Method, aiming to identifying the most efficient and effective buses as the candidate buses for VAR planning. Wind power uncertainties and the load dynamics are considered in this method, which makes the proposed method more practical. Complex load model is also considered in this paper to address the adverse impact of the induction motor loads on the power system. Cases studies are carried out on the New England 39-bus test system. Time- domain simulation results obtained from PSS®E demonstrate that the proposed method is effective with acceptable computation complexity.