线性基础设施项目基于流程的规划与控制方法研究

C. Formoso, P. Flores, Karina B. Barth, Martin Suarez, I. Magalhães, Verónica Ksiazenicki, Álvaro Acquarone
{"title":"线性基础设施项目基于流程的规划与控制方法研究","authors":"C. Formoso, P. Flores, Karina B. Barth, Martin Suarez, I. Magalhães, Verónica Ksiazenicki, Álvaro Acquarone","doi":"10.24928/2022/0236","DOIUrl":null,"url":null,"abstract":"The Last Planner System (LPS) and Location Based Planning and Control (LBPC) have been successfully used in many projects, either separately or together. Despite previous studies that have discussed the role of each of them, the complementarity between LPS and LBPC still needs to be further explained by using core Lean Production concepts. Moreover, most implementations reported in the literature of those two planning models have been concerned with building projects. Only a few cases are related to infrastructure projects, which have different types of complexity in relation to conventional building projects. This paper reports the initial results of the development of a planning and control model for linear infrastructure projects. This investigation was based on a case study carried out in a construction company from Uruguay. The development of the model considers some specific complexity features of linear infrastructure projects, such as high uncertainty, and independent linear processes spread around large urban or rural areas. The main insights provided by this study are concerned with devising a flow-based planning and control tool for look-ahead planning, the definition of criteria for devising location-based systems, the emphasis of work-in-progress control, and the use of visual management. design the company, and implementation in one pilot project; (iii) the planning and control model, by combining LPS and LBPC, and implementation in the three pilot projects; and (iv) definition of standard practices for production system design (PSD), and production planning and control. PSD can be described as collaborative and systemic pre-construction planning exercise, as described Barth et al. The proposed model for planning and control was built on what kept several existing good practices.","PeriodicalId":111246,"journal":{"name":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Developing a Flow-Based Planning and Control Approach for Linear Infrastructure Projects\",\"authors\":\"C. Formoso, P. Flores, Karina B. Barth, Martin Suarez, I. Magalhães, Verónica Ksiazenicki, Álvaro Acquarone\",\"doi\":\"10.24928/2022/0236\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Last Planner System (LPS) and Location Based Planning and Control (LBPC) have been successfully used in many projects, either separately or together. Despite previous studies that have discussed the role of each of them, the complementarity between LPS and LBPC still needs to be further explained by using core Lean Production concepts. Moreover, most implementations reported in the literature of those two planning models have been concerned with building projects. Only a few cases are related to infrastructure projects, which have different types of complexity in relation to conventional building projects. This paper reports the initial results of the development of a planning and control model for linear infrastructure projects. This investigation was based on a case study carried out in a construction company from Uruguay. The development of the model considers some specific complexity features of linear infrastructure projects, such as high uncertainty, and independent linear processes spread around large urban or rural areas. The main insights provided by this study are concerned with devising a flow-based planning and control tool for look-ahead planning, the definition of criteria for devising location-based systems, the emphasis of work-in-progress control, and the use of visual management. design the company, and implementation in one pilot project; (iii) the planning and control model, by combining LPS and LBPC, and implementation in the three pilot projects; and (iv) definition of standard practices for production system design (PSD), and production planning and control. PSD can be described as collaborative and systemic pre-construction planning exercise, as described Barth et al. The proposed model for planning and control was built on what kept several existing good practices.\",\"PeriodicalId\":111246,\"journal\":{\"name\":\"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2022/0236\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proc. 30th Annual Conference of the International Group for Lean Construction (IGLC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2022/0236","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

最后规划系统(LPS)和基于位置的规划和控制(LBPC)已经成功地应用于许多项目中,无论是单独的还是一起的。尽管之前的研究已经讨论了它们各自的作用,但LPS和LBPC之间的互补性仍然需要通过使用核心精益生产概念来进一步解释。此外,这两种规划模型的文献中报道的大多数实现都与构建项目有关。只有少数案例与基础设施项目有关,这些项目与传统建筑项目相比具有不同类型的复杂性。本文报告了线性基础设施项目规划和控制模型开发的初步结果。这项调查是基于在乌拉圭一家建筑公司进行的案例研究。该模型的开发考虑了线性基础设施项目的一些特定复杂性特征,如高不确定性,以及分布在大城市或农村地区的独立线性过程。本研究提供的主要见解涉及设计一种基于流程的计划和控制工具,用于前瞻性计划,定义设计基于位置的系统的标准,强调在制品控制,以及使用可视化管理。设计公司,并在一个试点项目中实施;(iii)结合LPS和LBPC的规划和控制模式,以及在三个试点项目中的实施情况;(iv)定义生产系统设计(PSD)、生产计划和控制的标准做法。正如Barth等人所描述的那样,PSD可以被描述为协作和系统的施工前规划练习。拟议的规划和控制模型是建立在保留几个现有良好实践的基础上的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Developing a Flow-Based Planning and Control Approach for Linear Infrastructure Projects
The Last Planner System (LPS) and Location Based Planning and Control (LBPC) have been successfully used in many projects, either separately or together. Despite previous studies that have discussed the role of each of them, the complementarity between LPS and LBPC still needs to be further explained by using core Lean Production concepts. Moreover, most implementations reported in the literature of those two planning models have been concerned with building projects. Only a few cases are related to infrastructure projects, which have different types of complexity in relation to conventional building projects. This paper reports the initial results of the development of a planning and control model for linear infrastructure projects. This investigation was based on a case study carried out in a construction company from Uruguay. The development of the model considers some specific complexity features of linear infrastructure projects, such as high uncertainty, and independent linear processes spread around large urban or rural areas. The main insights provided by this study are concerned with devising a flow-based planning and control tool for look-ahead planning, the definition of criteria for devising location-based systems, the emphasis of work-in-progress control, and the use of visual management. design the company, and implementation in one pilot project; (iii) the planning and control model, by combining LPS and LBPC, and implementation in the three pilot projects; and (iv) definition of standard practices for production system design (PSD), and production planning and control. PSD can be described as collaborative and systemic pre-construction planning exercise, as described Barth et al. The proposed model for planning and control was built on what kept several existing good practices.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书