Pietro Valnegri, D. Scaccabarozzi, F. Capaccioni, G. Bellucci, G. Rinaldi, B. Saggin
{"title":"DORA望远镜面包板实验验证","authors":"Pietro Valnegri, D. Scaccabarozzi, F. Capaccioni, G. Bellucci, G. Rinaldi, B. Saggin","doi":"10.1109/MetroAeroSpace57412.2023.10189936","DOIUrl":null,"url":null,"abstract":"This work aims at characterizing the breadboard of the DORA telescope deployment mechanism designed to set in position the secondary mirror of a Cassegrain optical telescope. The goal of the testing campaign is the tuning of the system to match the positioning. In parallel, the forces required during the deployment have been measured, being a relevant input for the following development phases where the design of a space-qualified actuation system must be performed","PeriodicalId":153093,"journal":{"name":"2023 IEEE 10th International Workshop on Metrology for AeroSpace (MetroAeroSpace)","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DORA Telescope Breadboard Experimental Verification\",\"authors\":\"Pietro Valnegri, D. Scaccabarozzi, F. Capaccioni, G. Bellucci, G. Rinaldi, B. Saggin\",\"doi\":\"10.1109/MetroAeroSpace57412.2023.10189936\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work aims at characterizing the breadboard of the DORA telescope deployment mechanism designed to set in position the secondary mirror of a Cassegrain optical telescope. The goal of the testing campaign is the tuning of the system to match the positioning. In parallel, the forces required during the deployment have been measured, being a relevant input for the following development phases where the design of a space-qualified actuation system must be performed\",\"PeriodicalId\":153093,\"journal\":{\"name\":\"2023 IEEE 10th International Workshop on Metrology for AeroSpace (MetroAeroSpace)\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 IEEE 10th International Workshop on Metrology for AeroSpace (MetroAeroSpace)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MetroAeroSpace57412.2023.10189936\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 IEEE 10th International Workshop on Metrology for AeroSpace (MetroAeroSpace)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MetroAeroSpace57412.2023.10189936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
DORA Telescope Breadboard Experimental Verification
This work aims at characterizing the breadboard of the DORA telescope deployment mechanism designed to set in position the secondary mirror of a Cassegrain optical telescope. The goal of the testing campaign is the tuning of the system to match the positioning. In parallel, the forces required during the deployment have been measured, being a relevant input for the following development phases where the design of a space-qualified actuation system must be performed