{"title":"马来西亚首个海底油田废弃项目","authors":"C. Ho","doi":"10.2118/193959-MS","DOIUrl":null,"url":null,"abstract":"\n This paper covers the End-of-Field Life management and abandonment planning for four subsea fields. Scope includes end-to-end planning from confirming cessation of production with the Regulator, to Abandonment Planning, actual Implementation and Execution.\n PETRONAS Procedures and Guidelines for Upstream Activities (PPGUA), Company internal guidelines and Industry Practices are available for End-of-Field Life management, Abandonment Planning and Execution. These guidelines were used pragmatically in addressing both technical and non-technical challenges on these four fields, including but not limited to PSC Obligations and Regulatory Compliance, Selection of Abandonment Concept, Execution Strategy, etc. The lack of experience in subsea field abandonment provided a unique opportunity for collaboration among industry players, constructive challenges, and the acceptability of new ideas including ways of working, processes and implementation of rules/guidelines.\n There are six subsea wells in these four fields, in different water depths, some of which are in a cluster while others are not. The scope and timeline for each was evaluated on individual basis to draw alignment with its field and PSC-specific requirements; some are thereafter bundled together into a campaign to gain efficiency and savings via a broader synergy approach.\n Two broad scopes were considered: Wells Plug and Abandonment (P&A), and Subsea facilities decommissioning and abandonment. All wells P&A are aligned to industry practice and PPGUA. Field in shallower water was planned for full decommissioning and abandonment with subsea tree removed and recovered; a new diverless flushing tool (developed in collaboration with subsea vendor) was used to clean the pipeline that will be left in-situ. For field in deeper water (more than 100 meters), comparative assessment was carried out and the results support \"leave in-situ\" concept. Fit-for-purpose Marine Biology assessment was carried out by a local university to support this concept. The plan is to have this abandonment concept presented to the relevant Government Agencies for final approval.","PeriodicalId":437819,"journal":{"name":"Day 1 Mon, December 03, 2018","volume":"166 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Malaysia's First Subsea Fields Abandonment\",\"authors\":\"C. Ho\",\"doi\":\"10.2118/193959-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This paper covers the End-of-Field Life management and abandonment planning for four subsea fields. Scope includes end-to-end planning from confirming cessation of production with the Regulator, to Abandonment Planning, actual Implementation and Execution.\\n PETRONAS Procedures and Guidelines for Upstream Activities (PPGUA), Company internal guidelines and Industry Practices are available for End-of-Field Life management, Abandonment Planning and Execution. These guidelines were used pragmatically in addressing both technical and non-technical challenges on these four fields, including but not limited to PSC Obligations and Regulatory Compliance, Selection of Abandonment Concept, Execution Strategy, etc. The lack of experience in subsea field abandonment provided a unique opportunity for collaboration among industry players, constructive challenges, and the acceptability of new ideas including ways of working, processes and implementation of rules/guidelines.\\n There are six subsea wells in these four fields, in different water depths, some of which are in a cluster while others are not. The scope and timeline for each was evaluated on individual basis to draw alignment with its field and PSC-specific requirements; some are thereafter bundled together into a campaign to gain efficiency and savings via a broader synergy approach.\\n Two broad scopes were considered: Wells Plug and Abandonment (P&A), and Subsea facilities decommissioning and abandonment. All wells P&A are aligned to industry practice and PPGUA. Field in shallower water was planned for full decommissioning and abandonment with subsea tree removed and recovered; a new diverless flushing tool (developed in collaboration with subsea vendor) was used to clean the pipeline that will be left in-situ. For field in deeper water (more than 100 meters), comparative assessment was carried out and the results support \\\"leave in-situ\\\" concept. Fit-for-purpose Marine Biology assessment was carried out by a local university to support this concept. The plan is to have this abandonment concept presented to the relevant Government Agencies for final approval.\",\"PeriodicalId\":437819,\"journal\":{\"name\":\"Day 1 Mon, December 03, 2018\",\"volume\":\"166 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, December 03, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/193959-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, December 03, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193959-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了四个海底油田的油田寿命管理和废弃计划。范围包括端到端的计划,从向监管机构确认停止生产,到废弃计划,实际实施和执行。PETRONAS的上游活动程序和指南(PPGUA)、公司内部指南和行业实践可用于油田寿命结束管理、废弃计划和执行。这些指导方针被务实地用于解决这四个领域的技术和非技术挑战,包括但不限于PSC义务和法规遵从、放弃概念的选择、执行策略等。海底油田弃井经验的缺乏为行业参与者之间的合作、建设性挑战以及新想法的可接受性提供了独特的机会,包括工作方式、流程和规则/指导方针的实施。在这四个油田中,有6口水下井,位于不同的水深,其中一些是在一个集群中,而另一些则不是。对每个项目的范围和时间表进行了单独评估,以与其领域和psc特定要求保持一致;之后,一些项目被捆绑在一起,通过更广泛的协同方式提高效率和节省开支。考虑了两个广泛的范围:油井封井和弃井(P&A),以及海底设施的退役和弃井。所有井的弃井作业均符合行业惯例和PPGUA。浅水油田计划完全退役和废弃,移除并回收海底采油树;一种新的无潜水员冲洗工具(与海底供应商合作开发)用于清洁将留在原位的管道。对于水深较深(100米以上)的油田,进行了对比评价,结果支持“原地不动”的理念。一所本地大学进行了切合实际的海洋生物学评估,以支持这一概念。计划将这一废弃概念提交给政府相关部门进行最后审批。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Malaysia's First Subsea Fields Abandonment
This paper covers the End-of-Field Life management and abandonment planning for four subsea fields. Scope includes end-to-end planning from confirming cessation of production with the Regulator, to Abandonment Planning, actual Implementation and Execution. PETRONAS Procedures and Guidelines for Upstream Activities (PPGUA), Company internal guidelines and Industry Practices are available for End-of-Field Life management, Abandonment Planning and Execution. These guidelines were used pragmatically in addressing both technical and non-technical challenges on these four fields, including but not limited to PSC Obligations and Regulatory Compliance, Selection of Abandonment Concept, Execution Strategy, etc. The lack of experience in subsea field abandonment provided a unique opportunity for collaboration among industry players, constructive challenges, and the acceptability of new ideas including ways of working, processes and implementation of rules/guidelines. There are six subsea wells in these four fields, in different water depths, some of which are in a cluster while others are not. The scope and timeline for each was evaluated on individual basis to draw alignment with its field and PSC-specific requirements; some are thereafter bundled together into a campaign to gain efficiency and savings via a broader synergy approach. Two broad scopes were considered: Wells Plug and Abandonment (P&A), and Subsea facilities decommissioning and abandonment. All wells P&A are aligned to industry practice and PPGUA. Field in shallower water was planned for full decommissioning and abandonment with subsea tree removed and recovered; a new diverless flushing tool (developed in collaboration with subsea vendor) was used to clean the pipeline that will be left in-situ. For field in deeper water (more than 100 meters), comparative assessment was carried out and the results support "leave in-situ" concept. Fit-for-purpose Marine Biology assessment was carried out by a local university to support this concept. The plan is to have this abandonment concept presented to the relevant Government Agencies for final approval.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信