积极的机电继电器面板更换项目在TXU电气交付

A. Jeżak, R. Garcia
{"title":"积极的机电继电器面板更换项目在TXU电气交付","authors":"A. Jeżak, R. Garcia","doi":"10.1109/CPRE.2005.1430432","DOIUrl":null,"url":null,"abstract":"TXU electric delivery is quite similar to most utility companies in the United States that have been around for over 100 years. There is always a need to track aging equipment and to decide when it is time to maintain, repair or replace equipment and that includes relays. For several years the issue of what to do with aging electromechanical relaying systems had been discussed and several possible options were explored. This paper addresses the process in the development of a microprocessor based relay replacement panel. Also discussed is the successful installation of 170 retrofit panels in 2004 and plans to replace an additional 1030 panel in the next three to four years. This paper also discussed the issues associated with undertaking such a project and will provide a glimpse on how the project is going.","PeriodicalId":395312,"journal":{"name":"58th Annual Conference for Protective Relay Engineers, 2005.","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Aggressive electromechanical relay panel replacement project at TXU electric delivery\",\"authors\":\"A. Jeżak, R. Garcia\",\"doi\":\"10.1109/CPRE.2005.1430432\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"TXU electric delivery is quite similar to most utility companies in the United States that have been around for over 100 years. There is always a need to track aging equipment and to decide when it is time to maintain, repair or replace equipment and that includes relays. For several years the issue of what to do with aging electromechanical relaying systems had been discussed and several possible options were explored. This paper addresses the process in the development of a microprocessor based relay replacement panel. Also discussed is the successful installation of 170 retrofit panels in 2004 and plans to replace an additional 1030 panel in the next three to four years. This paper also discussed the issues associated with undertaking such a project and will provide a glimpse on how the project is going.\",\"PeriodicalId\":395312,\"journal\":{\"name\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2005.1430432\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"58th Annual Conference for Protective Relay Engineers, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2005.1430432","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

TXU的电力输送与美国大多数已有100多年历史的公用事业公司非常相似。总是需要跟踪老化的设备,并决定何时维护、修理或更换设备,包括继电器。多年来,人们一直在讨论如何处理老化的机电继电系统,并探索了几种可能的选择。本文介绍了一种基于微处理器的继电器更换面板的研制过程。此外,还讨论了2004年成功安装170块改装面板,并计划在未来三到四年更换另外1030块面板。本文还讨论了与开展这样一个项目相关的问题,并将提供项目如何进行的一瞥。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Aggressive electromechanical relay panel replacement project at TXU electric delivery
TXU electric delivery is quite similar to most utility companies in the United States that have been around for over 100 years. There is always a need to track aging equipment and to decide when it is time to maintain, repair or replace equipment and that includes relays. For several years the issue of what to do with aging electromechanical relaying systems had been discussed and several possible options were explored. This paper addresses the process in the development of a microprocessor based relay replacement panel. Also discussed is the successful installation of 170 retrofit panels in 2004 and plans to replace an additional 1030 panel in the next three to four years. This paper also discussed the issues associated with undertaking such a project and will provide a glimpse on how the project is going.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信