{"title":"突发事件下电力系统协调可观测性PMU优化配置","authors":"D. Shrivastava, S. A. Siddiqui, K. Verma","doi":"10.1109/ICCS1.2017.8326016","DOIUrl":null,"url":null,"abstract":"The deployment of Phasor Measurement Units (PMUs) are important for proper monitoring and control of modern power systems. In this paper, Optimal PMU Placement (OPP) problem is solved to obtain the complete observability of power system with minimum number of PMUs under normal and abnormal operating conditions. The proposed OPP problem determines coordinated observability considering multiple contingency cases: single line outage, double line outage resulting in bus isolation, single PMU loss resulting in communication failure. Integer Linear Programming (ILP) is used to determine optimal number and locations for OPP problem. Moreover, Optimal PMU placement problem with conventional measurements is modified for incorporation of bus isolation caused due to contingency. The effectiveness of proposed methodology has been tested on IEEE 14-bus system and New England 39-bus power system. The results highlight the practical suitability of the proposed approach at the control centers.","PeriodicalId":367360,"journal":{"name":"2017 IEEE International Conference on Circuits and Systems (ICCS)","volume":"69 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Optimal PMU placement for coordinated observability of power system under contingencies\",\"authors\":\"D. Shrivastava, S. A. Siddiqui, K. Verma\",\"doi\":\"10.1109/ICCS1.2017.8326016\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The deployment of Phasor Measurement Units (PMUs) are important for proper monitoring and control of modern power systems. In this paper, Optimal PMU Placement (OPP) problem is solved to obtain the complete observability of power system with minimum number of PMUs under normal and abnormal operating conditions. The proposed OPP problem determines coordinated observability considering multiple contingency cases: single line outage, double line outage resulting in bus isolation, single PMU loss resulting in communication failure. Integer Linear Programming (ILP) is used to determine optimal number and locations for OPP problem. Moreover, Optimal PMU placement problem with conventional measurements is modified for incorporation of bus isolation caused due to contingency. The effectiveness of proposed methodology has been tested on IEEE 14-bus system and New England 39-bus power system. The results highlight the practical suitability of the proposed approach at the control centers.\",\"PeriodicalId\":367360,\"journal\":{\"name\":\"2017 IEEE International Conference on Circuits and Systems (ICCS)\",\"volume\":\"69 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE International Conference on Circuits and Systems (ICCS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCS1.2017.8326016\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE International Conference on Circuits and Systems (ICCS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCS1.2017.8326016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

相量测量单元(pmu)的部署对于现代电力系统的监测和控制具有重要意义。本文解决了电力系统在正常和异常运行状态下,以最小PMU数量获得系统完全可观察性的最优PMU配置问题。提出的OPP问题考虑多种突发情况确定协调可观察性:单线中断,双线中断导致总线隔离,单个PMU丢失导致通信失败。采用整数线性规划(ILP)方法确定OPP问题的最优数量和最优位置。此外,改进了传统测量的最优PMU放置问题,纳入了由于偶然性引起的总线隔离。该方法的有效性已在IEEE 14总线系统和新英格兰39总线电力系统上进行了测试。结果强调了所提出的方法在控制中心的实际适用性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal PMU placement for coordinated observability of power system under contingencies
The deployment of Phasor Measurement Units (PMUs) are important for proper monitoring and control of modern power systems. In this paper, Optimal PMU Placement (OPP) problem is solved to obtain the complete observability of power system with minimum number of PMUs under normal and abnormal operating conditions. The proposed OPP problem determines coordinated observability considering multiple contingency cases: single line outage, double line outage resulting in bus isolation, single PMU loss resulting in communication failure. Integer Linear Programming (ILP) is used to determine optimal number and locations for OPP problem. Moreover, Optimal PMU placement problem with conventional measurements is modified for incorporation of bus isolation caused due to contingency. The effectiveness of proposed methodology has been tested on IEEE 14-bus system and New England 39-bus power system. The results highlight the practical suitability of the proposed approach at the control centers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信