{"title":"确保在组合式绝缘卷屋顶修复期间的安全工作条件","authors":"V. N. Chernoivan, A. V. Torkhova, N. Chernoivan","doi":"10.37105/iboa.122","DOIUrl":null,"url":null,"abstract":"The recommended option for rehabilitation of operated combined insulated rolled roofs allows to reduce the cost of measures to ensure safe working conditions. The article proposes a construction solution similar to an inverted roof. In the proposed solution, the role of a vapor barrier is played by the repaired layers of the existing waterproofing layer to which the insulation board has been attached.","PeriodicalId":227499,"journal":{"name":"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Ensuring safe working conditions during the rehabilitation of operated combined insulated rolled roofs\",\"authors\":\"V. N. Chernoivan, A. V. Torkhova, N. Chernoivan\",\"doi\":\"10.37105/iboa.122\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The recommended option for rehabilitation of operated combined insulated rolled roofs allows to reduce the cost of measures to ensure safe working conditions. The article proposes a construction solution similar to an inverted roof. In the proposed solution, the role of a vapor barrier is played by the repaired layers of the existing waterproofing layer to which the insulation board has been attached.\",\"PeriodicalId\":227499,\"journal\":{\"name\":\"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37105/iboa.122\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inżynieria Bezpieczeństwa Obiektów Antropogenicznych","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37105/iboa.122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Ensuring safe working conditions during the rehabilitation of operated combined insulated rolled roofs
The recommended option for rehabilitation of operated combined insulated rolled roofs allows to reduce the cost of measures to ensure safe working conditions. The article proposes a construction solution similar to an inverted roof. In the proposed solution, the role of a vapor barrier is played by the repaired layers of the existing waterproofing layer to which the insulation board has been attached.