{"title":"利用同步矢量仪实现自动隔离的可能性研究","authors":"D. Stepanov, T. Klimova","doi":"10.1109/RPA.2018.8537226","DOIUrl":null,"url":null,"abstract":"For today one of the actual problems of modern electric power industry are the optimal moments of switching on the line under voltage with automatic reclouser (hereinafter - AR), leading to excessively higher values of current, voltage and network frequency parameters. The main task is still to take into account the transient processes and the characteristic features of the network section during commutations in the automatic reclosure process.","PeriodicalId":345204,"journal":{"name":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","volume":"105 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research of the Possibility of Using Synchronized Vector Meter for the Realization of Automatic Reclouser\",\"authors\":\"D. Stepanov, T. Klimova\",\"doi\":\"10.1109/RPA.2018.8537226\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For today one of the actual problems of modern electric power industry are the optimal moments of switching on the line under voltage with automatic reclouser (hereinafter - AR), leading to excessively higher values of current, voltage and network frequency parameters. The main task is still to take into account the transient processes and the characteristic features of the network section during commutations in the automatic reclosure process.\",\"PeriodicalId\":345204,\"journal\":{\"name\":\"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)\",\"volume\":\"105 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RPA.2018.8537226\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RPA.2018.8537226","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research of the Possibility of Using Synchronized Vector Meter for the Realization of Automatic Reclouser
For today one of the actual problems of modern electric power industry are the optimal moments of switching on the line under voltage with automatic reclouser (hereinafter - AR), leading to excessively higher values of current, voltage and network frequency parameters. The main task is still to take into account the transient processes and the characteristic features of the network section during commutations in the automatic reclosure process.