A. Tiezzi, D. Lott, Wayne J. Lott, William J. O'brien, J. Borcherding
{"title":"建筑施工中使用矩阵生产管理方法提高效率的案例研究","authors":"A. Tiezzi, D. Lott, Wayne J. Lott, William J. O'brien, J. Borcherding","doi":"10.1061/9780784482889.064","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":322194,"journal":{"name":"Construction Research Congress 2020","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study of Efficiency Improvements Using Matrix Methods of Production Management in Building Construction\",\"authors\":\"A. Tiezzi, D. Lott, Wayne J. Lott, William J. O'brien, J. Borcherding\",\"doi\":\"10.1061/9780784482889.064\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":322194,\"journal\":{\"name\":\"Construction Research Congress 2020\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Research Congress 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/9780784482889.064\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Research Congress 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784482889.064","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}