带混合直流断路器的直流-直流系统暂态故障灭弧时间的评估

S. De Maria, M. Marzinotto, F. Palone, S. Patti, F. Gatta, M. Graziani, S. Lauria
{"title":"带混合直流断路器的直流-直流系统暂态故障灭弧时间的评估","authors":"S. De Maria, M. Marzinotto, F. Palone, S. Patti, F. Gatta, M. Graziani, S. Lauria","doi":"10.1109/AEITHVDC58550.2023.10178997","DOIUrl":null,"url":null,"abstract":"The interest in half-bridge Voltage Source Converters (VSCs) with HVDC circuit breakers is a solution to manage transient faults when the link is fully or partially made with an overhead line. The role of the HVDC circuit breaker becomes of paramount importance since to clear transient faults its ability to operate multi reclosures helps to increase the availability of the link. On the other hand, the arc current extinction time on the fault point along the line plays a not negligible role since this time has an impact on the reclosure of the line. Unfortunately, very little can be found in the scientific literature about HVDC breakers. For such reason, in this paper with the aim to study the fault current transients and the stresses an intentionally simplified approach has been adopted with the goal to have a first access to the expected values. The estimation of the arc extinction time of transient pole-to-ground fault in overhead HVDC line, which impacts the minimum dead time for a successful reclosure, is in any case the main aim of this paper. This is a first and necessary step to understand if potential critical issues could be expected. A deeper analysis should be carried out once more details will be available about these technologies.","PeriodicalId":185809,"journal":{"name":"2023 AEIT HVDC International Conference (AEIT HVDC)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of Arc Current Extinction Time of Transient Faults in HVDC-VSC Systems with Hybrid DC Breakers\",\"authors\":\"S. De Maria, M. Marzinotto, F. Palone, S. Patti, F. Gatta, M. Graziani, S. Lauria\",\"doi\":\"10.1109/AEITHVDC58550.2023.10178997\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The interest in half-bridge Voltage Source Converters (VSCs) with HVDC circuit breakers is a solution to manage transient faults when the link is fully or partially made with an overhead line. The role of the HVDC circuit breaker becomes of paramount importance since to clear transient faults its ability to operate multi reclosures helps to increase the availability of the link. On the other hand, the arc current extinction time on the fault point along the line plays a not negligible role since this time has an impact on the reclosure of the line. Unfortunately, very little can be found in the scientific literature about HVDC breakers. For such reason, in this paper with the aim to study the fault current transients and the stresses an intentionally simplified approach has been adopted with the goal to have a first access to the expected values. The estimation of the arc extinction time of transient pole-to-ground fault in overhead HVDC line, which impacts the minimum dead time for a successful reclosure, is in any case the main aim of this paper. This is a first and necessary step to understand if potential critical issues could be expected. A deeper analysis should be carried out once more details will be available about these technologies.\",\"PeriodicalId\":185809,\"journal\":{\"name\":\"2023 AEIT HVDC International Conference (AEIT HVDC)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 AEIT HVDC International Conference (AEIT HVDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEITHVDC58550.2023.10178997\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 AEIT HVDC International Conference (AEIT HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEITHVDC58550.2023.10178997","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

对带高压直流断路器的半桥电压源转换器(VSCs)的兴趣是一种解决方案,用于管理当链路全部或部分与架空线连接时的瞬态故障。高压直流断路器的作用变得至关重要,因为为了清除暂态故障,其操作多个重合闸的能力有助于提高链路的可用性。另一方面,沿线路故障点的消弧时间对线路的重合闸有影响,起着不可忽视的作用。不幸的是,关于高压直流断路器的科学文献很少。因此,本文为了研究故障电流瞬态和应力,特意采用了简化的方法,目的是首先获得期望值。在任何情况下,架空直流线路中瞬态极地故障消弧时间的估计都是本文的主要目的,它影响着成功重合闸的最小死区时间。这是了解是否可能出现潜在关键问题的第一步,也是必要的一步。一旦获得这些技术的更多细节,就应该进行更深入的分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of Arc Current Extinction Time of Transient Faults in HVDC-VSC Systems with Hybrid DC Breakers
The interest in half-bridge Voltage Source Converters (VSCs) with HVDC circuit breakers is a solution to manage transient faults when the link is fully or partially made with an overhead line. The role of the HVDC circuit breaker becomes of paramount importance since to clear transient faults its ability to operate multi reclosures helps to increase the availability of the link. On the other hand, the arc current extinction time on the fault point along the line plays a not negligible role since this time has an impact on the reclosure of the line. Unfortunately, very little can be found in the scientific literature about HVDC breakers. For such reason, in this paper with the aim to study the fault current transients and the stresses an intentionally simplified approach has been adopted with the goal to have a first access to the expected values. The estimation of the arc extinction time of transient pole-to-ground fault in overhead HVDC line, which impacts the minimum dead time for a successful reclosure, is in any case the main aim of this paper. This is a first and necessary step to understand if potential critical issues could be expected. A deeper analysis should be carried out once more details will be available about these technologies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信