{"title":"C-17航空电子设备维修中级自动测试系统","authors":"J. Allen, C. A. McNeil","doi":"10.1109/AUTEST.1994.381571","DOIUrl":null,"url":null,"abstract":"Significant challenges exist when automatic test systems are developed concurrently with avionics to support initial aircraft deployment. The C-17 Globemaster III Intermediate Level Avionics Maintenance System meets those challenges. The C-17A \"support by capability\" program requirement is a unique contractual environment for Test Program Set development. Process based management coupled with low risk development strategies provided a path for on-time Test Program Set deployment. The strategy of using government inventory B-1B Automatic Test Equipment contributed to concurrent Test Program Set operations with the very first day of the C-17A aircraft deployment. This industry \"first\" is not without some valuable lessons learned.<<ETX>>","PeriodicalId":308840,"journal":{"name":"Proceedings of AUTOTESTCON '94","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"C-17 intermediate level automatic test system for avionics maintenance\",\"authors\":\"J. Allen, C. A. McNeil\",\"doi\":\"10.1109/AUTEST.1994.381571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Significant challenges exist when automatic test systems are developed concurrently with avionics to support initial aircraft deployment. The C-17 Globemaster III Intermediate Level Avionics Maintenance System meets those challenges. The C-17A \\\"support by capability\\\" program requirement is a unique contractual environment for Test Program Set development. Process based management coupled with low risk development strategies provided a path for on-time Test Program Set deployment. The strategy of using government inventory B-1B Automatic Test Equipment contributed to concurrent Test Program Set operations with the very first day of the C-17A aircraft deployment. This industry \\\"first\\\" is not without some valuable lessons learned.<<ETX>>\",\"PeriodicalId\":308840,\"journal\":{\"name\":\"Proceedings of AUTOTESTCON '94\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of AUTOTESTCON '94\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUTEST.1994.381571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of AUTOTESTCON '94","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUTEST.1994.381571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
C-17 intermediate level automatic test system for avionics maintenance
Significant challenges exist when automatic test systems are developed concurrently with avionics to support initial aircraft deployment. The C-17 Globemaster III Intermediate Level Avionics Maintenance System meets those challenges. The C-17A "support by capability" program requirement is a unique contractual environment for Test Program Set development. Process based management coupled with low risk development strategies provided a path for on-time Test Program Set deployment. The strategy of using government inventory B-1B Automatic Test Equipment contributed to concurrent Test Program Set operations with the very first day of the C-17A aircraft deployment. This industry "first" is not without some valuable lessons learned.<>