{"title":"发电和输电扩展规划的确定性方法","authors":"C. Sima, G. Lazaroiu, V. Dumbrava, G. Lazaroiu, C. Panait, M. Roscia","doi":"10.1109/EFEA.2018.8617109","DOIUrl":null,"url":null,"abstract":"In this paper, the Generation and Transmission Expansion Planning (G&TEP) problem, considering two case studies, is analyzed. In the first case, the GEP and TEP problems are considered separately, while in the second GEP and TEP problems are solved together, thus G&TEP problem appears. The objective function of the mixed-integer linear programming (MILP) problem is minimizing the expected generation costs, load-shedding costs and investment costs. The planner can modify the presented mathematical model in order to satisfy any other system requirements considering G&TEP problem. The approach presented in this paper is a deterministic static one. The investment decision is considered to be made at the beginning of the planning horizon.","PeriodicalId":447143,"journal":{"name":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Deterministic Approach for Generation and Transmission Expansion Planning\",\"authors\":\"C. Sima, G. Lazaroiu, V. Dumbrava, G. Lazaroiu, C. Panait, M. Roscia\",\"doi\":\"10.1109/EFEA.2018.8617109\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the Generation and Transmission Expansion Planning (G&TEP) problem, considering two case studies, is analyzed. In the first case, the GEP and TEP problems are considered separately, while in the second GEP and TEP problems are solved together, thus G&TEP problem appears. The objective function of the mixed-integer linear programming (MILP) problem is minimizing the expected generation costs, load-shedding costs and investment costs. The planner can modify the presented mathematical model in order to satisfy any other system requirements considering G&TEP problem. The approach presented in this paper is a deterministic static one. The investment decision is considered to be made at the beginning of the planning horizon.\",\"PeriodicalId\":447143,\"journal\":{\"name\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EFEA.2018.8617109\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EFEA.2018.8617109","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Deterministic Approach for Generation and Transmission Expansion Planning
In this paper, the Generation and Transmission Expansion Planning (G&TEP) problem, considering two case studies, is analyzed. In the first case, the GEP and TEP problems are considered separately, while in the second GEP and TEP problems are solved together, thus G&TEP problem appears. The objective function of the mixed-integer linear programming (MILP) problem is minimizing the expected generation costs, load-shedding costs and investment costs. The planner can modify the presented mathematical model in order to satisfy any other system requirements considering G&TEP problem. The approach presented in this paper is a deterministic static one. The investment decision is considered to be made at the beginning of the planning horizon.