{"title":"升级电网保护以满足德州公用事业委员会的规定","authors":"L. Matus, G. Dalke","doi":"10.1109/CPRE.2005.1430439","DOIUrl":null,"url":null,"abstract":"The 51N/32 combination functioned as a 67N directional overcurrent ground relay. In order to safely export power to the utility, safeguards had to be installed immediately. As part of the power contract, transfer trip equipment had to be installed at each utility substation and at the plant site to provide fast tripping of the intertie circuit breakers. Due to the long lead-time for procurement of transfer trip equipment and installation, immediate action was taken to prevent any power from exporting. Since the current protection relays did not give enough flexibility for additional trip set points, a microprocessor based multifunction relay was considered as an interim option.","PeriodicalId":395312,"journal":{"name":"58th Annual Conference for Protective Relay Engineers, 2005.","volume":"273 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Upgrading intertie protection to meet Texas public utility commission rules\",\"authors\":\"L. Matus, G. Dalke\",\"doi\":\"10.1109/CPRE.2005.1430439\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The 51N/32 combination functioned as a 67N directional overcurrent ground relay. In order to safely export power to the utility, safeguards had to be installed immediately. As part of the power contract, transfer trip equipment had to be installed at each utility substation and at the plant site to provide fast tripping of the intertie circuit breakers. Due to the long lead-time for procurement of transfer trip equipment and installation, immediate action was taken to prevent any power from exporting. Since the current protection relays did not give enough flexibility for additional trip set points, a microprocessor based multifunction relay was considered as an interim option.\",\"PeriodicalId\":395312,\"journal\":{\"name\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"volume\":\"273 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"58th Annual Conference for Protective Relay Engineers, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2005.1430439\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"58th Annual Conference for Protective Relay Engineers, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2005.1430439","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

51N/32组合作为67N方向过流接地继电器。为了安全地向公用事业输出电力,必须立即安装防护装置。作为电力合同的一部分,必须在每个公用事业变电站和工厂现场安装传输跳闸设备,以提供互连断路器的快速跳闸。由于采购转运设备和安装需要很长时间,因此立即采取行动防止任何电力出口。由于目前的保护继电器没有足够的灵活性来提供额外的跳闸设定点,基于微处理器的多功能继电器被认为是一种临时选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Upgrading intertie protection to meet Texas public utility commission rules
The 51N/32 combination functioned as a 67N directional overcurrent ground relay. In order to safely export power to the utility, safeguards had to be installed immediately. As part of the power contract, transfer trip equipment had to be installed at each utility substation and at the plant site to provide fast tripping of the intertie circuit breakers. Due to the long lead-time for procurement of transfer trip equipment and installation, immediate action was taken to prevent any power from exporting. Since the current protection relays did not give enough flexibility for additional trip set points, a microprocessor based multifunction relay was considered as an interim option.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信