{"title":"现场风能测量和初步传输评估:怀俄明州的案例研究","authors":"K. Meah, A. Ula","doi":"10.1109/TPSD.2008.4562748","DOIUrl":null,"url":null,"abstract":"This paper presents on-site wind energy measurement data at 50 meter and the wind turbine layout diagram for three different sites in Wyoming. This paper also presents a preliminary transmission assessment for each site with existing transmission lines and the steps required for transmission line interconnection. The capacity factor, geographic location, and nearby existing transmission line at each site are suitable for developing a wind energy farm. The study shows that commercial wind electricity generation is feasible technically and economically.","PeriodicalId":410786,"journal":{"name":"2008 IEEE Region 5 Conference","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"On-Site Wind Energy Measurement and Preliminary Transmission Assessment: Case Studies in Wyoming\",\"authors\":\"K. Meah, A. Ula\",\"doi\":\"10.1109/TPSD.2008.4562748\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents on-site wind energy measurement data at 50 meter and the wind turbine layout diagram for three different sites in Wyoming. This paper also presents a preliminary transmission assessment for each site with existing transmission lines and the steps required for transmission line interconnection. The capacity factor, geographic location, and nearby existing transmission line at each site are suitable for developing a wind energy farm. The study shows that commercial wind electricity generation is feasible technically and economically.\",\"PeriodicalId\":410786,\"journal\":{\"name\":\"2008 IEEE Region 5 Conference\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-04-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 IEEE Region 5 Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TPSD.2008.4562748\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 IEEE Region 5 Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TPSD.2008.4562748","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
On-Site Wind Energy Measurement and Preliminary Transmission Assessment: Case Studies in Wyoming
This paper presents on-site wind energy measurement data at 50 meter and the wind turbine layout diagram for three different sites in Wyoming. This paper also presents a preliminary transmission assessment for each site with existing transmission lines and the steps required for transmission line interconnection. The capacity factor, geographic location, and nearby existing transmission line at each site are suitable for developing a wind energy farm. The study shows that commercial wind electricity generation is feasible technically and economically.