在公用事业削减合同协议下的备用发电

G. J. Nolan, V.J. Puccio, C. Calhoun
{"title":"在公用事业削减合同协议下的备用发电","authors":"G. J. Nolan, V.J. Puccio, C. Calhoun","doi":"10.1109/ICPS.1996.533949","DOIUrl":null,"url":null,"abstract":"Many electric utilities in the United States offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing and Helicopters of Philadelphia, Pennsylvania, USA, required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.","PeriodicalId":122944,"journal":{"name":"Proceedings of 1996 IAS Industrial and Commercial Power Systems Technical Conference","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Standby power generation under utility curtailment contract agreements\",\"authors\":\"G. J. Nolan, V.J. Puccio, C. Calhoun\",\"doi\":\"10.1109/ICPS.1996.533949\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Many electric utilities in the United States offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing and Helicopters of Philadelphia, Pennsylvania, USA, required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.\",\"PeriodicalId\":122944,\"journal\":{\"name\":\"Proceedings of 1996 IAS Industrial and Commercial Power Systems Technical Conference\",\"volume\":\"30 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-05-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 1996 IAS Industrial and Commercial Power Systems Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPS.1996.533949\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 1996 IAS Industrial and Commercial Power Systems Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPS.1996.533949","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

美国的许多电力公司为大型工业和商业客户提供电力销售合同,这些合同在有限电要求的情况下具有诱人的价格。这种限电要求允许公用事业公司要求客户在特定时间段内将其电力需求减少到预定的水平。本文综述了一个弃电合同客户所面临的备选方案,以及潜在的减载和备用发电系统的设计。给出了一个在现有工业设施实施弃电合同的实例。举例来说,美国宾夕法尼亚州费城的波音和直升机公司需要减载和备用发电。该减载方案相当复杂,由可编程逻辑控制器(PLC)控制。详细分析了该装置的备用发电和减载系统。此外,还讨论了从实现对示例工具的必要修改中获得的经验教训。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Standby power generation under utility curtailment contract agreements
Many electric utilities in the United States offer large industrial and commercial customers power sales contracts which have attractive rates under a curtailment requirement. This curtailment requirement allows the utility to require the customer to reduce its power demand to a predetermined level within a specific time period. This paper reviews the alternatives faced by a curtailment contract customer together with potential load shedding and standby generation system designs. An example of implementing a curtailment contract at an existing industrial facility is presented. The example facility, Boeing and Helicopters of Philadelphia, Pennsylvania, USA, required both load shedding and standby generation. The load shedding scheme is fairly complex and is controlled by a programmable logic controller (PLC). The standby generation and load shedding systems for the example facility are examined in detail. Also, lessons learned from implementing the required modifications to the example facility are discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信