{"title":"在检查策略下的部件因延期维修而导致的故障风险","authors":"Gu Hongqiang, Jianmin Zhao","doi":"10.1109/ANTHOLOGY.2013.6785059","DOIUrl":null,"url":null,"abstract":"In this paper, an analytical model is developed for evaluating the risk of deferred repair under an inspection policy. The models of failures and risk evaluation are developed using probability, stochastic process and the delay time concept. The cases of perfect inspection and imperfect inspection are considered respectively. The performance of the proposed model is illustrated by an example, and the effect of time delay of repair on the risk is analysed.","PeriodicalId":203169,"journal":{"name":"IEEE Conference Anthology","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risk of failures induced by deferred maintenance for a component under inspection policy\",\"authors\":\"Gu Hongqiang, Jianmin Zhao\",\"doi\":\"10.1109/ANTHOLOGY.2013.6785059\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, an analytical model is developed for evaluating the risk of deferred repair under an inspection policy. The models of failures and risk evaluation are developed using probability, stochastic process and the delay time concept. The cases of perfect inspection and imperfect inspection are considered respectively. The performance of the proposed model is illustrated by an example, and the effect of time delay of repair on the risk is analysed.\",\"PeriodicalId\":203169,\"journal\":{\"name\":\"IEEE Conference Anthology\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Conference Anthology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ANTHOLOGY.2013.6785059\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Conference Anthology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ANTHOLOGY.2013.6785059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risk of failures induced by deferred maintenance for a component under inspection policy
In this paper, an analytical model is developed for evaluating the risk of deferred repair under an inspection policy. The models of failures and risk evaluation are developed using probability, stochastic process and the delay time concept. The cases of perfect inspection and imperfect inspection are considered respectively. The performance of the proposed model is illustrated by an example, and the effect of time delay of repair on the risk is analysed.