马朗·卡朗洛·托洛地下通道建设后的性能分析

Aliffasha Wianda Putranto, Dwi Ratnaningsih, M. Subkhan
{"title":"马朗·卡朗洛·托洛地下通道建设后的性能分析","authors":"Aliffasha Wianda Putranto, Dwi Ratnaningsih, M. Subkhan","doi":"10.55404/jos-mrk.2021.02.03.56-60","DOIUrl":null,"url":null,"abstract":"Karanglo underpass construction aims to reduce traffic congestion at the Karanglo intersection due to the addition of the Malang - Pandaan Toll Road arm. Anyhow, at the end road of Karanglo Intersection causes traffic jam and long vehicle queue. Related with that problem, so it is necessary to analyze the intersection performance, alternative improvement, and vehicle operating cost at the Karanglo intersection. The data used in this analysis are primary and secondary data. Primary data are obtained from road geometric measurements and phase and signal cycle measurements, while secondary data are obtained from the Central Statistics Agency (BPS) of Malang Regency and forecasting LHR data and side barriers. For the data processing, it uses Indonesian Highway Capacity Manual (MKJI) method 1997. Vehicle operating cost uses a handbook from Ministry of Public Works Directorate General of Highways 2005. Based on the analysis’ result, the performance of the existing intersection condition obtained delay (D) = 220.12 and the intersection service level (LOS) = E. From the analysis’ result, it is needed an alternative of intersection refinement by designing the signal phase, so that the delay (D) = 21.99 and the intersection services level (LOS) = C. The Vehicle operating cost before there was underpass for light vehicle was Rp 6.143/km. The vehicle operating cost after the underpass for light vehicle was Rp. 4.979/km.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS KINERJA SIMPANG KARANGLO PASCA PEMBANGUNAN UNDERPASS KARANGLO TOL MALANG – PANDAAN\",\"authors\":\"Aliffasha Wianda Putranto, Dwi Ratnaningsih, M. Subkhan\",\"doi\":\"10.55404/jos-mrk.2021.02.03.56-60\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Karanglo underpass construction aims to reduce traffic congestion at the Karanglo intersection due to the addition of the Malang - Pandaan Toll Road arm. Anyhow, at the end road of Karanglo Intersection causes traffic jam and long vehicle queue. Related with that problem, so it is necessary to analyze the intersection performance, alternative improvement, and vehicle operating cost at the Karanglo intersection. The data used in this analysis are primary and secondary data. Primary data are obtained from road geometric measurements and phase and signal cycle measurements, while secondary data are obtained from the Central Statistics Agency (BPS) of Malang Regency and forecasting LHR data and side barriers. For the data processing, it uses Indonesian Highway Capacity Manual (MKJI) method 1997. Vehicle operating cost uses a handbook from Ministry of Public Works Directorate General of Highways 2005. Based on the analysis’ result, the performance of the existing intersection condition obtained delay (D) = 220.12 and the intersection service level (LOS) = E. From the analysis’ result, it is needed an alternative of intersection refinement by designing the signal phase, so that the delay (D) = 21.99 and the intersection services level (LOS) = C. The Vehicle operating cost before there was underpass for light vehicle was Rp 6.143/km. The vehicle operating cost after the underpass for light vehicle was Rp. 4.979/km.\",\"PeriodicalId\":337938,\"journal\":{\"name\":\"Jurnal JOS-MRK\",\"volume\":\"75 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal JOS-MRK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55404/jos-mrk.2021.02.03.56-60\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.56-60","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

卡朗格洛地下通道的建设旨在减少卡朗格洛十字路口的交通拥堵,因为增加了玛琅-潘达安收费公路。无论如何,在卡朗格洛十字路口的尽头路造成交通堵塞和长车辆排队。因此,有必要对卡朗路交叉口的交叉口性能、改进方案和车辆运行成本进行分析。本分析中使用的数据有一手数据和二手数据。主要数据来自道路几何测量和相位和信号周期测量,而次要数据来自马郎县中央统计局(BPS)和预测LHR数据和侧障。数据处理采用1997年印尼公路通行能力手册(MKJI)方法。车辆运营成本采用2005年公共工程总局公路部的手册。根据分析结果,现有交叉口条件的表现得到交叉口延误(D) = 220.12,交叉口服务水平(LOS) = e。根据分析结果,需要通过设计信号相位对交叉口进行细化,使延误(D) = 21.99,交叉口服务水平(LOS) = c。轻型车辆地下通道后的车辆运营成本为4.979卢比/公里。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS KINERJA SIMPANG KARANGLO PASCA PEMBANGUNAN UNDERPASS KARANGLO TOL MALANG – PANDAAN
Karanglo underpass construction aims to reduce traffic congestion at the Karanglo intersection due to the addition of the Malang - Pandaan Toll Road arm. Anyhow, at the end road of Karanglo Intersection causes traffic jam and long vehicle queue. Related with that problem, so it is necessary to analyze the intersection performance, alternative improvement, and vehicle operating cost at the Karanglo intersection. The data used in this analysis are primary and secondary data. Primary data are obtained from road geometric measurements and phase and signal cycle measurements, while secondary data are obtained from the Central Statistics Agency (BPS) of Malang Regency and forecasting LHR data and side barriers. For the data processing, it uses Indonesian Highway Capacity Manual (MKJI) method 1997. Vehicle operating cost uses a handbook from Ministry of Public Works Directorate General of Highways 2005. Based on the analysis’ result, the performance of the existing intersection condition obtained delay (D) = 220.12 and the intersection service level (LOS) = E. From the analysis’ result, it is needed an alternative of intersection refinement by designing the signal phase, so that the delay (D) = 21.99 and the intersection services level (LOS) = C. The Vehicle operating cost before there was underpass for light vehicle was Rp 6.143/km. The vehicle operating cost after the underpass for light vehicle was Rp. 4.979/km.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信