灵活的网格资产管理分析

J. Coullon, Navin Rego
{"title":"灵活的网格资产管理分析","authors":"J. Coullon, Navin Rego","doi":"10.1109/SASG.2014.7274285","DOIUrl":null,"url":null,"abstract":"This paper presents a case study about an Condition Monitoring project for Asset Management implementing an advanced decision process for maintenance and asset replacement in the QATAR electricity distribution network. It describes the principles used to produce an assessment of the health of the entire fleet of assets, together with the concepts retained to prioritize the interventions on the distribution network equipment. The paper goes through the actual steps taken for the preparation and execution mode of the overall project. It covers the following project phases: · Definition of the problem & business objectives · Process definition and preparation tasks · Presentation of Solutions · Execution phase The project being still in the implementation phase, the conclusions are preliminary but already demonstrate concrete and tangible benefits.","PeriodicalId":395633,"journal":{"name":"2014 Saudi Arabia Smart Grid Conference (SASG)","volume":"109 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Flexible analytics for management of grid assets\",\"authors\":\"J. Coullon, Navin Rego\",\"doi\":\"10.1109/SASG.2014.7274285\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a case study about an Condition Monitoring project for Asset Management implementing an advanced decision process for maintenance and asset replacement in the QATAR electricity distribution network. It describes the principles used to produce an assessment of the health of the entire fleet of assets, together with the concepts retained to prioritize the interventions on the distribution network equipment. The paper goes through the actual steps taken for the preparation and execution mode of the overall project. It covers the following project phases: · Definition of the problem & business objectives · Process definition and preparation tasks · Presentation of Solutions · Execution phase The project being still in the implementation phase, the conclusions are preliminary but already demonstrate concrete and tangible benefits.\",\"PeriodicalId\":395633,\"journal\":{\"name\":\"2014 Saudi Arabia Smart Grid Conference (SASG)\",\"volume\":\"109 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Saudi Arabia Smart Grid Conference (SASG)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SASG.2014.7274285\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Saudi Arabia Smart Grid Conference (SASG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SASG.2014.7274285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了一个关于资产管理状态监测项目的案例研究,该项目在卡塔尔配电网络中实施了维护和资产更换的高级决策过程。它描述了用于对整个资产船队的健康状况进行评估的原则,以及为优先考虑配电网设备的干预措施而保留的概念。本文详细介绍了整个项目的准备和执行模式的实际步骤。它涵盖了以下项目阶段:·问题和业务目标的定义·过程定义和准备任务·解决方案的展示·执行阶段项目仍处于实施阶段,结论是初步的,但已经证明了具体和有形的利益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Flexible analytics for management of grid assets
This paper presents a case study about an Condition Monitoring project for Asset Management implementing an advanced decision process for maintenance and asset replacement in the QATAR electricity distribution network. It describes the principles used to produce an assessment of the health of the entire fleet of assets, together with the concepts retained to prioritize the interventions on the distribution network equipment. The paper goes through the actual steps taken for the preparation and execution mode of the overall project. It covers the following project phases: · Definition of the problem & business objectives · Process definition and preparation tasks · Presentation of Solutions · Execution phase The project being still in the implementation phase, the conclusions are preliminary but already demonstrate concrete and tangible benefits.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信