{"title":"PERENCANAAN GEOMETRIK DAN PERKERASAN LENTUR PADA JALAN NANGAMIRO - JALAN PANCASILA, KABUPATEN DOMPU, NUSA TENGGARA BARAT (STA 0+000 - 8+758)","authors":"rafif rahmatullah, M. Marjono, R. Sasongko","doi":"10.55404/jos-mrk.2021.02.03.67-71","DOIUrl":null,"url":null,"abstract":"The road as a transportation system plays an important role, especially in supporting the economy in the Dompu district. Therefore, the planning of the Nangamiro road to the Pancasila road is a road needed by the community and is the main road for the mobility of agricultural / plantation products and also as one of the connecting access roads between Pancasila Village and Nangamiro Village, Pekat District, Dompu Regency to Kananga Village, District Tambora, Bima Regency. The road planning is made with 2 alternatives to choose the best and is planned using flexible pavement. This road planning includes road dimension planning, horizontal alignment and vertical alignment based on the Bina Marga Standard Guidelines for Inter-City Road Geometric Planning Procedures (No.038 / T / BM / 1997), and pavement planning using flexible pavement using the Pd T-01- method. 2002-B Planning Guidelines for Flexible Pavement Thickness. Based on this planning, it is obtained that the track length is 8.539 km with 5 bends of the SCS type with L1 = 190.995 m, L2 = 238.163 m, L3 = 137.031 m, L4 = 174.672 m, L5 = 214.306 m. 2 vertical curves are convex, namely Lv1 = 230.00 m, Lv3 = 230.00 m and 2 vertical curves, namely Lv2 = 230.00 m, Lv4 = 230.00 m, and the thickness of the flexible pavement layer is 7.00 cm with a total cost Rp 144,391,237,000.00,-.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"438 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.67-71","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
道路作为一种交通系统发挥着重要的作用,特别是在支持东普地区的经济方面。因此,规划的Nangamiro路到Pancasila路是社区需要的道路,是农业/种植园产品流动的主要道路,也是潘卡西拉村和东普县佩卡特区Nangamiro村到比马县坦博拉区Kananga村之间的连接通道之一。道路规划有2种选择方案,选择最优方案,采用柔性路面进行规划。该道路规划包括道路尺寸规划、基于比纳玛加城际道路几何规划程序标准指南(No.038 / T / BM / 1997)的水平对齐和垂直对齐,以及使用Pd T-01-方法使用柔性路面的路面规划。2002-B弹性路面厚度规划指引根据这个计划,这是获得轨道长度是8.539公里,5 SCS类型的弯曲与L1 = 190.995 m, L2 = 238.163 m, L3 = 137.031 m, L4 = 174.672 m, L5 = 214.306米。2垂直曲线是凸的,即Lv1 = 230.00 m, Lv3 = 230.00米,2垂直曲线,即Lv2 = 230.00 m, Lv4 = 230.00 m,柔性路面层的厚度是7.00厘米总成本144391237000卢比,-。
PERENCANAAN GEOMETRIK DAN PERKERASAN LENTUR PADA JALAN NANGAMIRO - JALAN PANCASILA, KABUPATEN DOMPU, NUSA TENGGARA BARAT (STA 0+000 - 8+758)
The road as a transportation system plays an important role, especially in supporting the economy in the Dompu district. Therefore, the planning of the Nangamiro road to the Pancasila road is a road needed by the community and is the main road for the mobility of agricultural / plantation products and also as one of the connecting access roads between Pancasila Village and Nangamiro Village, Pekat District, Dompu Regency to Kananga Village, District Tambora, Bima Regency. The road planning is made with 2 alternatives to choose the best and is planned using flexible pavement. This road planning includes road dimension planning, horizontal alignment and vertical alignment based on the Bina Marga Standard Guidelines for Inter-City Road Geometric Planning Procedures (No.038 / T / BM / 1997), and pavement planning using flexible pavement using the Pd T-01- method. 2002-B Planning Guidelines for Flexible Pavement Thickness. Based on this planning, it is obtained that the track length is 8.539 km with 5 bends of the SCS type with L1 = 190.995 m, L2 = 238.163 m, L3 = 137.031 m, L4 = 174.672 m, L5 = 214.306 m. 2 vertical curves are convex, namely Lv1 = 230.00 m, Lv3 = 230.00 m and 2 vertical curves, namely Lv2 = 230.00 m, Lv4 = 230.00 m, and the thickness of the flexible pavement layer is 7.00 cm with a total cost Rp 144,391,237,000.00,-.