基于广域测量系统的失步保护系统研究

Xiying Chen, Weixing Li, He Chen, Zhizhong Guo
{"title":"基于广域测量系统的失步保护系统研究","authors":"Xiying Chen, Weixing Li, He Chen, Zhizhong Guo","doi":"10.1109/ICPST.2006.321823","DOIUrl":null,"url":null,"abstract":"Out-of-step protection is the worst situation to prevent a power system from collapse in the large-size connection electrified wire netting. If no methods adopted to deal with it, the power grid will blackout. So we must choose the right criteria to detect the synchronization loss, do well with the coordination methods and select the situation and the time to trip the generators. This paper outlines several criteria for detecting the synchronization loss and gives the advantages, disadvantages. It points out that it is worth to adopt ameliorated UCOS Phi criteria based on WAMS. The separate situation is at the connected with lines that the oscillation center located in, not but at the power balance spot. We should do our best to leave the load of related substation in the delivery end. The best separate time is at the soon an oscillation cycle ends because here the electric current of the break implement opening and break off is the least and its concussion is the least. We choose the best separate time at 2~3 oscillation cycle for lower voltage electrified wire netting. For 500 kV electrified wire netting we must separate it as soon as 1~2 oscillation cycle. Now WAMS can commute states and dates every 1.666 ms used light communications, it helps for studied on out-of-step and corresponded in total power grid on hardware. The result indicates that wide area measure system based realtime measure and faced entirely course for power grid is the best direction.","PeriodicalId":181574,"journal":{"name":"2006 International Conference on Power System Technology","volume":"1031 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Research of Out-of-Step Protection System Based on Wide Area Measure System\",\"authors\":\"Xiying Chen, Weixing Li, He Chen, Zhizhong Guo\",\"doi\":\"10.1109/ICPST.2006.321823\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Out-of-step protection is the worst situation to prevent a power system from collapse in the large-size connection electrified wire netting. If no methods adopted to deal with it, the power grid will blackout. So we must choose the right criteria to detect the synchronization loss, do well with the coordination methods and select the situation and the time to trip the generators. This paper outlines several criteria for detecting the synchronization loss and gives the advantages, disadvantages. It points out that it is worth to adopt ameliorated UCOS Phi criteria based on WAMS. The separate situation is at the connected with lines that the oscillation center located in, not but at the power balance spot. We should do our best to leave the load of related substation in the delivery end. The best separate time is at the soon an oscillation cycle ends because here the electric current of the break implement opening and break off is the least and its concussion is the least. We choose the best separate time at 2~3 oscillation cycle for lower voltage electrified wire netting. For 500 kV electrified wire netting we must separate it as soon as 1~2 oscillation cycle. Now WAMS can commute states and dates every 1.666 ms used light communications, it helps for studied on out-of-step and corresponded in total power grid on hardware. The result indicates that wide area measure system based realtime measure and faced entirely course for power grid is the best direction.\",\"PeriodicalId\":181574,\"journal\":{\"name\":\"2006 International Conference on Power System Technology\",\"volume\":\"1031 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 International Conference on Power System Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2006.321823\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 International Conference on Power System Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2006.321823","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

失步保护是大型连接电网中防止电力系统崩溃的最坏情况。如果不采取措施处理,电网将会停电。因此,必须选择合适的同步损耗检测标准,做好协调方法,选择跳闸的情况和时间。本文概述了几种检测同步损耗的准则,并给出了它们的优缺点。指出在WAMS的基础上采用改进的UCOS Phi标准是有价值的。分离情况发生在振荡中心所在的线路连接处,而不是功率平衡点处。我们要尽量把相关变电站的负荷留到交货端。最好的分离时间是在振荡周期结束不久的时候,因为此时断路器的开断电流最小,其震荡最小。我们选择了在2~3个振荡周期内对低压电线网进行分离的最佳时间。对于500kv的电网,必须在1~2个振荡周期内将其分离。目前WAMS采用光通信方式,每1.666 ms就可以进行一次状态和日期的交换,这有助于在硬件上研究不同步和与总电网相对应的问题。结果表明,基于实时测量和面向电网全程的广域测量系统是最好的发展方向。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research of Out-of-Step Protection System Based on Wide Area Measure System
Out-of-step protection is the worst situation to prevent a power system from collapse in the large-size connection electrified wire netting. If no methods adopted to deal with it, the power grid will blackout. So we must choose the right criteria to detect the synchronization loss, do well with the coordination methods and select the situation and the time to trip the generators. This paper outlines several criteria for detecting the synchronization loss and gives the advantages, disadvantages. It points out that it is worth to adopt ameliorated UCOS Phi criteria based on WAMS. The separate situation is at the connected with lines that the oscillation center located in, not but at the power balance spot. We should do our best to leave the load of related substation in the delivery end. The best separate time is at the soon an oscillation cycle ends because here the electric current of the break implement opening and break off is the least and its concussion is the least. We choose the best separate time at 2~3 oscillation cycle for lower voltage electrified wire netting. For 500 kV electrified wire netting we must separate it as soon as 1~2 oscillation cycle. Now WAMS can commute states and dates every 1.666 ms used light communications, it helps for studied on out-of-step and corresponded in total power grid on hardware. The result indicates that wide area measure system based realtime measure and faced entirely course for power grid is the best direction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信