基于市场的输电扩网规划:模糊风险评估

M. O. Buygi, G. Balzer, H. Shanechi, M. Shahidehpour
{"title":"基于市场的输电扩网规划:模糊风险评估","authors":"M. O. Buygi, G. Balzer, H. Shanechi, M. Shahidehpour","doi":"10.1109/DRPT.2004.1337997","DOIUrl":null,"url":null,"abstract":"In this paper a new market based approach for transmission expansion planning in deregulated power systems is presented. A scenario technique is used in order to model nonrandom uncertainties. Drawbacks of criteria of scenario technique are pointed out and new criteria are presented for risk assessment. A probabilistic tool is presented for assessing electric markets with random uncertainties. To measure how much a transmission plan improves competition a market based criterion is introduced. The final plan is selected using fuzzy risk assessment. The approach is applied to IEEE 30 bus network. The results are compared with conventional risk assessment to demonstrate that fuzzy risk assessment overcomes the shortcomings of conventional risk assessment method.","PeriodicalId":427228,"journal":{"name":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","volume":"92 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"35","resultStr":"{\"title\":\"Market based transmission expansion planning: fuzzy risk assessment\",\"authors\":\"M. O. Buygi, G. Balzer, H. Shanechi, M. Shahidehpour\",\"doi\":\"10.1109/DRPT.2004.1337997\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper a new market based approach for transmission expansion planning in deregulated power systems is presented. A scenario technique is used in order to model nonrandom uncertainties. Drawbacks of criteria of scenario technique are pointed out and new criteria are presented for risk assessment. A probabilistic tool is presented for assessing electric markets with random uncertainties. To measure how much a transmission plan improves competition a market based criterion is introduced. The final plan is selected using fuzzy risk assessment. The approach is applied to IEEE 30 bus network. The results are compared with conventional risk assessment to demonstrate that fuzzy risk assessment overcomes the shortcomings of conventional risk assessment method.\",\"PeriodicalId\":427228,\"journal\":{\"name\":\"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings\",\"volume\":\"92 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"35\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2004.1337997\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies. Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2004.1337997","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 35

摘要

本文提出了一种新的基于市场的非管制电力系统输电扩展规划方法。采用情景技术对非随机不确定性进行建模。指出了情景技术准则的不足,提出了新的风险评估准则。提出了一种评估具有随机不确定性的电力市场的概率工具。为了衡量输电计划在多大程度上改善了竞争,引入了一个基于市场的标准。采用模糊风险评价法选择最终方案。该方法已应用于ieee30总线网络。结果表明,模糊风险评价方法克服了传统风险评价方法的不足。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Market based transmission expansion planning: fuzzy risk assessment
In this paper a new market based approach for transmission expansion planning in deregulated power systems is presented. A scenario technique is used in order to model nonrandom uncertainties. Drawbacks of criteria of scenario technique are pointed out and new criteria are presented for risk assessment. A probabilistic tool is presented for assessing electric markets with random uncertainties. To measure how much a transmission plan improves competition a market based criterion is introduced. The final plan is selected using fuzzy risk assessment. The approach is applied to IEEE 30 bus network. The results are compared with conventional risk assessment to demonstrate that fuzzy risk assessment overcomes the shortcomings of conventional risk assessment method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信