{"title":"基于隧道性能预测的复合地层盾构施工参数优化","authors":"Min Hu, Mengdong Lu","doi":"10.1109/ITNEC56291.2023.10082107","DOIUrl":null,"url":null,"abstract":"Shield tunneling performance is one of the most concerned problems in shield tunneling. In order to solve the shortage of the existing performance evaluation index to guide the construction, this paper proposes a performance evaluation index based on the thrust-torque ratio, and verifies the effectiveness of the thrust-torque ratio through actual engineering. The XGBoost prediction model with the shield construction parameters as input and the actual thrust-torque ratio as output is constructed to predict the tunneling performance, and the prediction model results turn out well. Based on this prediction model, the performance of a historical project can be effectively improved by optimizing the adjustable construction parameters. The optimized results have achieved good results in the simulation, and are consistent with the subsequent engineering adjustment direction, which provides a new idea for the performance control of shield tunneling.","PeriodicalId":218770,"journal":{"name":"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)","volume":"202 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of shield construction parameters through composite strata based on tunneling performance prediction\",\"authors\":\"Min Hu, Mengdong Lu\",\"doi\":\"10.1109/ITNEC56291.2023.10082107\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Shield tunneling performance is one of the most concerned problems in shield tunneling. In order to solve the shortage of the existing performance evaluation index to guide the construction, this paper proposes a performance evaluation index based on the thrust-torque ratio, and verifies the effectiveness of the thrust-torque ratio through actual engineering. The XGBoost prediction model with the shield construction parameters as input and the actual thrust-torque ratio as output is constructed to predict the tunneling performance, and the prediction model results turn out well. Based on this prediction model, the performance of a historical project can be effectively improved by optimizing the adjustable construction parameters. The optimized results have achieved good results in the simulation, and are consistent with the subsequent engineering adjustment direction, which provides a new idea for the performance control of shield tunneling.\",\"PeriodicalId\":218770,\"journal\":{\"name\":\"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)\",\"volume\":\"202 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITNEC56291.2023.10082107\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITNEC56291.2023.10082107","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimization of shield construction parameters through composite strata based on tunneling performance prediction
Shield tunneling performance is one of the most concerned problems in shield tunneling. In order to solve the shortage of the existing performance evaluation index to guide the construction, this paper proposes a performance evaluation index based on the thrust-torque ratio, and verifies the effectiveness of the thrust-torque ratio through actual engineering. The XGBoost prediction model with the shield construction parameters as input and the actual thrust-torque ratio as output is constructed to predict the tunneling performance, and the prediction model results turn out well. Based on this prediction model, the performance of a historical project can be effectively improved by optimizing the adjustable construction parameters. The optimized results have achieved good results in the simulation, and are consistent with the subsequent engineering adjustment direction, which provides a new idea for the performance control of shield tunneling.