{"title":"努努坎县基站需求评估与规划","authors":"Vita Pusvita","doi":"10.30818/JPKM.2018.2030204","DOIUrl":null,"url":null,"abstract":"Nunukan Regency has geographical conditions that can prevent directly public services. Implementation of online public service can help government to reach community. However, the lack of telecommunication access, especially inaccessibility of users or the lack of BT capacity , is a major obstacle in the implementation of these service. Therefore, evaluation and planning of BTS requirement is needed in order to reach all users. The purpose of this research is to evaluate and plan the requirement of telecommunication tower in Nunukan Regency. This study used two methods in determining the BTS requirement by using the Standford University Interim (SUI) propagation model to determine the coverage area of telecommunication towers and using the calculation of BTS capacity to meet traffic requirements. The result obtained is the number of base stations which recorded are able to meet traffic requirements if it is assumed that all base stations which have been built are macro BTS with 3 sector antenna specification and the number of carriers 1 or 2, or micro BTS with 3 sectors antenna specification and the number of carriers 2. However, if it does not meet these specifications, it is necessary to increase the number of BTS based on BTS capacity for all sub-districts, except Krayan, Kraya Timur, Krayan Tengah and Krayan Barat.","PeriodicalId":176170,"journal":{"name":"Journal Pekommas","volume":"160 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Evaluation and Planning of Required of Base Transceiver Station (BTS) in Nunukan Regency\",\"authors\":\"Vita Pusvita\",\"doi\":\"10.30818/JPKM.2018.2030204\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nunukan Regency has geographical conditions that can prevent directly public services. Implementation of online public service can help government to reach community. However, the lack of telecommunication access, especially inaccessibility of users or the lack of BT capacity , is a major obstacle in the implementation of these service. Therefore, evaluation and planning of BTS requirement is needed in order to reach all users. The purpose of this research is to evaluate and plan the requirement of telecommunication tower in Nunukan Regency. This study used two methods in determining the BTS requirement by using the Standford University Interim (SUI) propagation model to determine the coverage area of telecommunication towers and using the calculation of BTS capacity to meet traffic requirements. The result obtained is the number of base stations which recorded are able to meet traffic requirements if it is assumed that all base stations which have been built are macro BTS with 3 sector antenna specification and the number of carriers 1 or 2, or micro BTS with 3 sectors antenna specification and the number of carriers 2. However, if it does not meet these specifications, it is necessary to increase the number of BTS based on BTS capacity for all sub-districts, except Krayan, Kraya Timur, Krayan Tengah and Krayan Barat.\",\"PeriodicalId\":176170,\"journal\":{\"name\":\"Journal Pekommas\",\"volume\":\"160 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal Pekommas\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30818/JPKM.2018.2030204\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal Pekommas","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30818/JPKM.2018.2030204","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

努努坎摄政的地理条件使其无法直接提供公共服务。网上公共服务的实施可以帮助政府接触到社区。然而,缺乏电信接入,特别是用户无法接入或缺乏BT容量,是实施这些服务的主要障碍。因此,为了覆盖所有用户,需要对BTS需求进行评估和规划。本研究的目的是评估和规划在努努坎摄政区电信塔的需求。本研究在确定BTS需求时采用了两种方法,一种是利用stanford University Interim (SUI)传播模型确定电信塔的覆盖面积,另一种是利用计算BTS容量来满足业务需求。如果假设所有已建成的基站均为3扇区天线规格、1或2载波数量的宏观BTS,或3扇区天线规格、2载波数量的微型BTS,则所记录的基站数量能够满足业务需求。但是,如果不符合这些规格,则有必要根据BTS容量在除Krayan、Krayan Timur、Krayan Tengah和Krayan Barat以外的所有街道增加BTS数量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation and Planning of Required of Base Transceiver Station (BTS) in Nunukan Regency
Nunukan Regency has geographical conditions that can prevent directly public services. Implementation of online public service can help government to reach community. However, the lack of telecommunication access, especially inaccessibility of users or the lack of BT capacity , is a major obstacle in the implementation of these service. Therefore, evaluation and planning of BTS requirement is needed in order to reach all users. The purpose of this research is to evaluate and plan the requirement of telecommunication tower in Nunukan Regency. This study used two methods in determining the BTS requirement by using the Standford University Interim (SUI) propagation model to determine the coverage area of telecommunication towers and using the calculation of BTS capacity to meet traffic requirements. The result obtained is the number of base stations which recorded are able to meet traffic requirements if it is assumed that all base stations which have been built are macro BTS with 3 sector antenna specification and the number of carriers 1 or 2, or micro BTS with 3 sectors antenna specification and the number of carriers 2. However, if it does not meet these specifications, it is necessary to increase the number of BTS based on BTS capacity for all sub-districts, except Krayan, Kraya Timur, Krayan Tengah and Krayan Barat.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信