越南建设-经营-转移运输项目准备阶段对总工期延迟的影响因素分析

H. Nguyen, Diem-Hang Pham
{"title":"越南建设-经营-转移运输项目准备阶段对总工期延迟的影响因素分析","authors":"H. Nguyen, Diem-Hang Pham","doi":"10.25073/tcsj.70.3.6","DOIUrl":null,"url":null,"abstract":"The involvement of private investors in public works has been widely-known under the scheme of Public-Private Partnerships (PPP) world-wide. Although being started in early years of the twenty-one century, the PPP scheme in Vietnam is still waiting for its booming period due to an incomprehensive regulation system. As of an approval of some important PPP decrees, the period of 2010-2018 is considered as a remarked period for the PPP development in Vietnam, especially in transport sector. Using the neural network approach, this study contributes to the literature by providing an insight of 48 build-operate-transfer (BOT) transport projects completed in the period. Findings of this study are meaningful to the field because they highlight several influenced factors of the project preparation phase those affect total completed construction time of the investigated projects.","PeriodicalId":129747,"journal":{"name":"Transport and Communication Science Journal","volume":"215 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Examining influenced factors of the preparation phase on total construction time delay of build-operate-transfer transport projects in Vietnam\",\"authors\":\"H. Nguyen, Diem-Hang Pham\",\"doi\":\"10.25073/tcsj.70.3.6\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The involvement of private investors in public works has been widely-known under the scheme of Public-Private Partnerships (PPP) world-wide. Although being started in early years of the twenty-one century, the PPP scheme in Vietnam is still waiting for its booming period due to an incomprehensive regulation system. As of an approval of some important PPP decrees, the period of 2010-2018 is considered as a remarked period for the PPP development in Vietnam, especially in transport sector. Using the neural network approach, this study contributes to the literature by providing an insight of 48 build-operate-transfer (BOT) transport projects completed in the period. Findings of this study are meaningful to the field because they highlight several influenced factors of the project preparation phase those affect total completed construction time of the investigated projects.\",\"PeriodicalId\":129747,\"journal\":{\"name\":\"Transport and Communication Science Journal\",\"volume\":\"215 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transport and Communication Science Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25073/tcsj.70.3.6\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transport and Communication Science Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25073/tcsj.70.3.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

私人投资者参与公共工程的做法在世界范围内以公私合作伙伴关系(PPP)的方式广为人知。越南PPP模式虽然在21世纪初就已经起步,但由于监管体系不完善,目前还处于繁荣期。由于批准了一些重要的PPP法令,2010-2018年被认为是越南PPP发展的重要时期,特别是在运输部门。利用神经网络方法,本研究对这一时期完成的48个BOT运输项目进行了分析。本研究结果突出了项目准备阶段影响所调查项目总完工时间的几个影响因素,具有一定的研究意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Examining influenced factors of the preparation phase on total construction time delay of build-operate-transfer transport projects in Vietnam
The involvement of private investors in public works has been widely-known under the scheme of Public-Private Partnerships (PPP) world-wide. Although being started in early years of the twenty-one century, the PPP scheme in Vietnam is still waiting for its booming period due to an incomprehensive regulation system. As of an approval of some important PPP decrees, the period of 2010-2018 is considered as a remarked period for the PPP development in Vietnam, especially in transport sector. Using the neural network approach, this study contributes to the literature by providing an insight of 48 build-operate-transfer (BOT) transport projects completed in the period. Findings of this study are meaningful to the field because they highlight several influenced factors of the project preparation phase those affect total completed construction time of the investigated projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信