{"title":"东坑水库钢筋混凝土面板堆石坝三维有限元分析","authors":"Zhen Ren","doi":"10.1109/IMSNA.2013.6742818","DOIUrl":null,"url":null,"abstract":"Through analyzing reinforced concrete face rockfill dam structure's mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out three-dimensional finite element analysis for reinforced concrete face rockfill dam of Dongkeng reservoir. Deducing distribution laws of the dam's stress and displacement in construction process and operating process. Analysis results show that, reinforced concrete face rockfill dam of Dongkeng reservoir construction is reasonable, it meets the requirements for design.","PeriodicalId":111582,"journal":{"name":"2013 2nd International Symposium on Instrumentation and Measurement, Sensor Network and Automation (IMSNA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Three-dimensional finite element analysis for reinforced concrete face rockfill dam of Dongkeng reservoir\",\"authors\":\"Zhen Ren\",\"doi\":\"10.1109/IMSNA.2013.6742818\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Through analyzing reinforced concrete face rockfill dam structure's mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out three-dimensional finite element analysis for reinforced concrete face rockfill dam of Dongkeng reservoir. Deducing distribution laws of the dam's stress and displacement in construction process and operating process. Analysis results show that, reinforced concrete face rockfill dam of Dongkeng reservoir construction is reasonable, it meets the requirements for design.\",\"PeriodicalId\":111582,\"journal\":{\"name\":\"2013 2nd International Symposium on Instrumentation and Measurement, Sensor Network and Automation (IMSNA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 2nd International Symposium on Instrumentation and Measurement, Sensor Network and Automation (IMSNA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IMSNA.2013.6742818\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 2nd International Symposium on Instrumentation and Measurement, Sensor Network and Automation (IMSNA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IMSNA.2013.6742818","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Three-dimensional finite element analysis for reinforced concrete face rockfill dam of Dongkeng reservoir
Through analyzing reinforced concrete face rockfill dam structure's mechanical characteristics in construction process and operating process, this paper adopts finite element method to carry out three-dimensional finite element analysis for reinforced concrete face rockfill dam of Dongkeng reservoir. Deducing distribution laws of the dam's stress and displacement in construction process and operating process. Analysis results show that, reinforced concrete face rockfill dam of Dongkeng reservoir construction is reasonable, it meets the requirements for design.