Li Hengxuan, Zhang Kanjun, Li Peng, Wen Bo, Wang Yang, E. Shiping
{"title":"智能变电站顺序控制的一种实现方法","authors":"Li Hengxuan, Zhang Kanjun, Li Peng, Wen Bo, Wang Yang, E. Shiping","doi":"10.1109/APPEEC45492.2019.8994471","DOIUrl":null,"url":null,"abstract":"This paper presents the application status and main problems of sequence control function in intelligent substations. By summarizing and analyzing the implementation of sequence control function, a safe and efficient one-click sequence control solution is proposed. A reasonably operation process is also formulated in this paper. And a reliable second criterion for positioning of isolation switch is put forward.","PeriodicalId":241317,"journal":{"name":"2019 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Implementation Method of Intelligent Substation Sequence Control\",\"authors\":\"Li Hengxuan, Zhang Kanjun, Li Peng, Wen Bo, Wang Yang, E. Shiping\",\"doi\":\"10.1109/APPEEC45492.2019.8994471\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the application status and main problems of sequence control function in intelligent substations. By summarizing and analyzing the implementation of sequence control function, a safe and efficient one-click sequence control solution is proposed. A reasonably operation process is also formulated in this paper. And a reliable second criterion for positioning of isolation switch is put forward.\",\"PeriodicalId\":241317,\"journal\":{\"name\":\"2019 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APPEEC45492.2019.8994471\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE PES Asia-Pacific Power and Energy Engineering Conference (APPEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APPEEC45492.2019.8994471","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Implementation Method of Intelligent Substation Sequence Control
This paper presents the application status and main problems of sequence control function in intelligent substations. By summarizing and analyzing the implementation of sequence control function, a safe and efficient one-click sequence control solution is proposed. A reasonably operation process is also formulated in this paper. And a reliable second criterion for positioning of isolation switch is put forward.