高优先级任务干扰下edf调度实时系统的充分可调度性测试

-. J.AugustoSantos, George Lima
{"title":"高优先级任务干扰下edf调度实时系统的充分可调度性测试","authors":"-. J.AugustoSantos, George Lima","doi":"10.1109/SBESC.2012.33","DOIUrl":null,"url":null,"abstract":"We provide four new schedulability tests for a scheduling model according to which there is a high priority task concurrently executed with a set of EDF-scheduled tasks. All tests are proved correct and have their performance evaluated by simulation.","PeriodicalId":112286,"journal":{"name":"2012 Brazilian Symposium on Computing System Engineering","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Sufficient Schedulability Tests for EDF-Scheduled Real-Time Systems under Interference of a High Priority Task\",\"authors\":\"-. J.AugustoSantos, George Lima\",\"doi\":\"10.1109/SBESC.2012.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We provide four new schedulability tests for a scheduling model according to which there is a high priority task concurrently executed with a set of EDF-scheduled tasks. All tests are proved correct and have their performance evaluated by simulation.\",\"PeriodicalId\":112286,\"journal\":{\"name\":\"2012 Brazilian Symposium on Computing System Engineering\",\"volume\":\"54 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Brazilian Symposium on Computing System Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SBESC.2012.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Brazilian Symposium on Computing System Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SBESC.2012.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

我们为一个调度模型提供了四个新的可调度性测试,根据该模型,有一个高优先级任务与一组edf调度任务并发执行。所有的测试都证明是正确的,并通过仿真对其性能进行了评价。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sufficient Schedulability Tests for EDF-Scheduled Real-Time Systems under Interference of a High Priority Task
We provide four new schedulability tests for a scheduling model according to which there is a high priority task concurrently executed with a set of EDF-scheduled tasks. All tests are proved correct and have their performance evaluated by simulation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信