{"title":"实用的ASIC生产线调度和生产线优化技术","authors":"C. Hashimoto, T. Takeda, S. Tazawa, T. Sakurai","doi":"10.1109/IEMT.1991.279766","DOIUrl":null,"url":null,"abstract":"For application-specific integrated circuit (ASIC) manufacturing lines, quick product turnaround time as well as high throughput is critical. To achieve both, efficient lot management and line operation are required. An automatic scheduler and its application methods have been developed for this purpose. With this technology, highly effective operation of an ASIC manufacturing line has been accomplished by optimizing both daily scheduling and line management.<<ETX>>","PeriodicalId":127257,"journal":{"name":"[1991 Proceedings] Eleventh IEEE/CHMT International Electronics Manufacturing Technology Symposium","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-09-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Practical scheduling and line optimization technology for ASIC manufacturing lines\",\"authors\":\"C. Hashimoto, T. Takeda, S. Tazawa, T. Sakurai\",\"doi\":\"10.1109/IEMT.1991.279766\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"For application-specific integrated circuit (ASIC) manufacturing lines, quick product turnaround time as well as high throughput is critical. To achieve both, efficient lot management and line operation are required. An automatic scheduler and its application methods have been developed for this purpose. With this technology, highly effective operation of an ASIC manufacturing line has been accomplished by optimizing both daily scheduling and line management.<<ETX>>\",\"PeriodicalId\":127257,\"journal\":{\"name\":\"[1991 Proceedings] Eleventh IEEE/CHMT International Electronics Manufacturing Technology Symposium\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-09-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1991 Proceedings] Eleventh IEEE/CHMT International Electronics Manufacturing Technology Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMT.1991.279766\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1991 Proceedings] Eleventh IEEE/CHMT International Electronics Manufacturing Technology Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMT.1991.279766","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Practical scheduling and line optimization technology for ASIC manufacturing lines
For application-specific integrated circuit (ASIC) manufacturing lines, quick product turnaround time as well as high throughput is critical. To achieve both, efficient lot management and line operation are required. An automatic scheduler and its application methods have been developed for this purpose. With this technology, highly effective operation of an ASIC manufacturing line has been accomplished by optimizing both daily scheduling and line management.<>