用ahp方法确定第一个军火库位置的优先级,以支持印尼军舰在印尼东部海域的安全行动

Muhammad Zulkifli, Cahyanto Cahyanto, Aris Tri Ika, I. Agustian
{"title":"用ahp方法确定第一个军火库位置的优先级,以支持印尼军舰在印尼东部海域的安全行动","authors":"Muhammad Zulkifli, Cahyanto Cahyanto, Aris Tri Ika, I. Agustian","doi":"10.37875/asro.v10i2.128","DOIUrl":null,"url":null,"abstract":"Faced with conditions of life of the nation that continues to evolve into a multidimensional cover all areas of the life of the nation, then certainly required the development and deployment of the total potential and power of the nation effectively. Therefore it is the power that was developed to deal with these threats must also have the ability to multi-dimensional as well. Reality is always pushing to restructure the military concept of defense to become responsive and adaptable and tailored to the substance of the reforms in the defense. The main problem faced by Indonesia to develop a domestic defense industry is the inability of industry and education sectors to absorb the fundamental aspects of the Revolution in Military Affairs (RMA). This inability does not allow Indonesia to experience significant breakthroughs in the application of RMA. So with reference to the condition necessary to anticipate concrete steps in developing a systematic plan to build the defense industries are able to anticipate the revolution in military affairs. Among priorities at once by selecting the appropriate stages of the development plan which includes the development of Main Equipment Weapon System, Spatial Planning Area Defense, Civil Defense Development, and Spatial Structure of the Organization. And one of its efforts is the creation of the ability of military logistics support system effective and efficient and responsive, which in this case is the development of Arsenal's arsenal of weapons and ammunition in terms of both quality and quantity so that is always ready to face any condition of any contingency that would happen. Determining policy location Arsenal first location contains more choices in environmental issues multi-objective and multicriteria decision, then the model is proposed to be the appropriate methodology to accommodate the qualitative preference and priority-setting objectives/criteria for future development is to approach the Analytical Hierarchy Process (AHP). Principle of the AHP method is to break breaking a complex situation and unstructured, into its component parts, arranging these variables in a section or an order of hierarchy, giving numerical values to subjective considerations about the relative importance of each variable and analysis various considerations is to determine which variables have the highest priority and act to influence the outcome of the situation. From the results of the solution by using the AHP method showed that the first priority location determination Arsenal 1 in the eastern region is a factor analysis of logistics operations to support operations capabilities in the integrated logistics support system that effectively and efficiently. And the locations selected for Arsenal's first priority location is in the eastern region Lantamal Ambon.","PeriodicalId":356564,"journal":{"name":"JOURNAL ASRO","volume":"80 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"DETERMINING THE FIRST PRIORITY OF THE FIRST ARSENAL LOCATION TO SUPPORT THE OPERATION OF THE INDONESIAN WARSHIP IN SAFETY OF THE EAST INDONESIAN SEA REGION WITH AHP METHODS\",\"authors\":\"Muhammad Zulkifli, Cahyanto Cahyanto, Aris Tri Ika, I. Agustian\",\"doi\":\"10.37875/asro.v10i2.128\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Faced with conditions of life of the nation that continues to evolve into a multidimensional cover all areas of the life of the nation, then certainly required the development and deployment of the total potential and power of the nation effectively. Therefore it is the power that was developed to deal with these threats must also have the ability to multi-dimensional as well. Reality is always pushing to restructure the military concept of defense to become responsive and adaptable and tailored to the substance of the reforms in the defense. The main problem faced by Indonesia to develop a domestic defense industry is the inability of industry and education sectors to absorb the fundamental aspects of the Revolution in Military Affairs (RMA). This inability does not allow Indonesia to experience significant breakthroughs in the application of RMA. So with reference to the condition necessary to anticipate concrete steps in developing a systematic plan to build the defense industries are able to anticipate the revolution in military affairs. Among priorities at once by selecting the appropriate stages of the development plan which includes the development of Main Equipment Weapon System, Spatial Planning Area Defense, Civil Defense Development, and Spatial Structure of the Organization. And one of its efforts is the creation of the ability of military logistics support system effective and efficient and responsive, which in this case is the development of Arsenal's arsenal of weapons and ammunition in terms of both quality and quantity so that is always ready to face any condition of any contingency that would happen. Determining policy location Arsenal first location contains more choices in environmental issues multi-objective and multicriteria decision, then the model is proposed to be the appropriate methodology to accommodate the qualitative preference and priority-setting objectives/criteria for future development is to approach the Analytical Hierarchy Process (AHP). Principle of the AHP method is to break breaking a complex situation and unstructured, into its component parts, arranging these variables in a section or an order of hierarchy, giving numerical values to subjective considerations about the relative importance of each variable and analysis various considerations is to determine which variables have the highest priority and act to influence the outcome of the situation. From the results of the solution by using the AHP method showed that the first priority location determination Arsenal 1 in the eastern region is a factor analysis of logistics operations to support operations capabilities in the integrated logistics support system that effectively and efficiently. And the locations selected for Arsenal's first priority location is in the eastern region Lantamal Ambon.\",\"PeriodicalId\":356564,\"journal\":{\"name\":\"JOURNAL ASRO\",\"volume\":\"80 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-07-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JOURNAL ASRO\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37875/asro.v10i2.128\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JOURNAL ASRO","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37875/asro.v10i2.128","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

面对民族生活不断演变成一个多维覆盖民族生活各个领域的条件,那么当然就需要有效地开发和部署民族的全部潜力和力量。因此,应对这些威胁的能力也必须具备多维度的能力。现实总是在推动国防军事概念的重构,使之适应和适应国防改革的实质。印度尼西亚在发展国内国防工业方面面临的主要问题是工业和教育部门无法吸收军事革命的基本方面。这种无能使印度尼西亚无法在军事革命的应用方面取得重大突破。因此,有必要根据实际情况预测具体步骤,制定系统的国防工业建设计划,才能预测军事革命。通过选择发展计划的适当阶段,其中包括主要装备武器系统的发展,空间规划区域防御,民防发展和本组织的空间结构,立即优先考虑。它的努力之一是建立军事后勤支持系统的能力,有效,高效,反应迅速,在这种情况下,就是在质量和数量上发展武器库的武器和弹药,以便随时准备面对任何可能发生的意外情况。首先,兵工厂选址在环境问题中包含更多的选择,多目标和多标准的决策,然后提出该模型是适当的方法,以适应定性偏好和优先级,为未来的发展设定目标/标准是接近层次分析法(AHP)。AHP方法的原理是将复杂的情况和非结构化的情况分解成其组成部分,将这些变量按部分或层次顺序排列,对每个变量的相对重要性给予主观考虑的数值,并分析各种考虑因素,以确定哪些变量具有最高的优先级并影响情况的结果。从求解结果中运用AHP方法表明,武器库1号东部地区的首要优先位置确定是对物流作业能力进行因素分析,使综合物流保障系统的作业能力有效、高效。而阿森纳选择的第一个优先位置是在东部地区兰塔马安汶。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
DETERMINING THE FIRST PRIORITY OF THE FIRST ARSENAL LOCATION TO SUPPORT THE OPERATION OF THE INDONESIAN WARSHIP IN SAFETY OF THE EAST INDONESIAN SEA REGION WITH AHP METHODS
Faced with conditions of life of the nation that continues to evolve into a multidimensional cover all areas of the life of the nation, then certainly required the development and deployment of the total potential and power of the nation effectively. Therefore it is the power that was developed to deal with these threats must also have the ability to multi-dimensional as well. Reality is always pushing to restructure the military concept of defense to become responsive and adaptable and tailored to the substance of the reforms in the defense. The main problem faced by Indonesia to develop a domestic defense industry is the inability of industry and education sectors to absorb the fundamental aspects of the Revolution in Military Affairs (RMA). This inability does not allow Indonesia to experience significant breakthroughs in the application of RMA. So with reference to the condition necessary to anticipate concrete steps in developing a systematic plan to build the defense industries are able to anticipate the revolution in military affairs. Among priorities at once by selecting the appropriate stages of the development plan which includes the development of Main Equipment Weapon System, Spatial Planning Area Defense, Civil Defense Development, and Spatial Structure of the Organization. And one of its efforts is the creation of the ability of military logistics support system effective and efficient and responsive, which in this case is the development of Arsenal's arsenal of weapons and ammunition in terms of both quality and quantity so that is always ready to face any condition of any contingency that would happen. Determining policy location Arsenal first location contains more choices in environmental issues multi-objective and multicriteria decision, then the model is proposed to be the appropriate methodology to accommodate the qualitative preference and priority-setting objectives/criteria for future development is to approach the Analytical Hierarchy Process (AHP). Principle of the AHP method is to break breaking a complex situation and unstructured, into its component parts, arranging these variables in a section or an order of hierarchy, giving numerical values to subjective considerations about the relative importance of each variable and analysis various considerations is to determine which variables have the highest priority and act to influence the outcome of the situation. From the results of the solution by using the AHP method showed that the first priority location determination Arsenal 1 in the eastern region is a factor analysis of logistics operations to support operations capabilities in the integrated logistics support system that effectively and efficiently. And the locations selected for Arsenal's first priority location is in the eastern region Lantamal Ambon.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信