测试外包——分包制造商的观点

Johnathan Roberts
{"title":"测试外包——分包制造商的观点","authors":"Johnathan Roberts","doi":"10.1109/TEST.2003.1271139","DOIUrl":null,"url":null,"abstract":"The growing test outsourcing business is characterized by a number of challenges. Production loading is nonlinear primarily due to market conditions, but also due to yield and wafer availability. This creates periods of high demand where there is a shortage of capacity and operations cycle times increase, or limited loading where the Subcontract Manufacturer (SCM) has difficulty maintaining profitability. Test operations are faced with a myriad of test requirements--from supporting multiple customers and products, maintaining and operating numerous types of testers, handlers and probers, as well as managing different tester configuration requirements based on product test needs, test strategy or simply load board layout. When test setup is protracted due to long test program load times, calibration, correlation or retest, the SCM’s effective loading decreases and cycle time increases. Moreover, all this activity must be managed within an environment of constant price pressure from the market and effective capital cost growth.","PeriodicalId":236182,"journal":{"name":"International Test Conference, 2003. Proceedings. ITC 2003.","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Test outsourcing - a subcontract manufacturer's perspective\",\"authors\":\"Johnathan Roberts\",\"doi\":\"10.1109/TEST.2003.1271139\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The growing test outsourcing business is characterized by a number of challenges. Production loading is nonlinear primarily due to market conditions, but also due to yield and wafer availability. This creates periods of high demand where there is a shortage of capacity and operations cycle times increase, or limited loading where the Subcontract Manufacturer (SCM) has difficulty maintaining profitability. Test operations are faced with a myriad of test requirements--from supporting multiple customers and products, maintaining and operating numerous types of testers, handlers and probers, as well as managing different tester configuration requirements based on product test needs, test strategy or simply load board layout. When test setup is protracted due to long test program load times, calibration, correlation or retest, the SCM’s effective loading decreases and cycle time increases. Moreover, all this activity must be managed within an environment of constant price pressure from the market and effective capital cost growth.\",\"PeriodicalId\":236182,\"journal\":{\"name\":\"International Test Conference, 2003. Proceedings. ITC 2003.\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Test Conference, 2003. Proceedings. ITC 2003.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TEST.2003.1271139\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Test Conference, 2003. Proceedings. ITC 2003.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TEST.2003.1271139","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

不断增长的测试外包业务的特点是面临许多挑战。生产负荷是非线性的,主要受市场条件的影响,但也受产量和晶圆可用性的影响。这就造成了产能不足、操作周期增加的高需求时期,或者分包制造商(SCM)难以维持盈利能力的有限负荷时期。测试操作面临着无数的测试需求——从支持多个客户和产品,维护和操作众多类型的测试器,处理程序和探测器,以及根据产品测试需求,测试策略或简单的负载板布局管理不同的测试器配置需求。当由于长时间的测试程序加载、校准、相关或重新测试而延长测试设置时,SCM的有效加载降低,周期时间增加。此外,所有这些活动都必须在来自市场的持续价格压力和有效资本成本增长的环境下进行管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Test outsourcing - a subcontract manufacturer's perspective
The growing test outsourcing business is characterized by a number of challenges. Production loading is nonlinear primarily due to market conditions, but also due to yield and wafer availability. This creates periods of high demand where there is a shortage of capacity and operations cycle times increase, or limited loading where the Subcontract Manufacturer (SCM) has difficulty maintaining profitability. Test operations are faced with a myriad of test requirements--from supporting multiple customers and products, maintaining and operating numerous types of testers, handlers and probers, as well as managing different tester configuration requirements based on product test needs, test strategy or simply load board layout. When test setup is protracted due to long test program load times, calibration, correlation or retest, the SCM’s effective loading decreases and cycle time increases. Moreover, all this activity must be managed within an environment of constant price pressure from the market and effective capital cost growth.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信