基于等效电路建模的快速电源/地网络优化

S. Tan, C. Shi
{"title":"基于等效电路建模的快速电源/地网络优化","authors":"S. Tan, C. Shi","doi":"10.1145/378239.379021","DOIUrl":null,"url":null,"abstract":"This paper presents an efficient algorithm for optimizing the area of power or ground networks in integrated circuits subject to the reliability constraints. Instead of solving the original power/ground networks extracted from circuit layouts as previous methods did, the new method first builds the equivalent models for many series resistors in the original networks, then the sequence of linear programming method is used to solve the simplified networks. The solutions of the original networks then are back solved from the optimized, simplified networks. The new algorithm simply exploits the regularities in the power/ground networks. Experimental results show that the complexities of simplified networks are typically significantly smaller than that of the original circuits, which renders the new algorithm extremely fast. For instance, power/ground networks with more than one million branches can be sized in a few minutes on modern SUN workstations.","PeriodicalId":154316,"journal":{"name":"Proceedings of the 38th Design Automation Conference (IEEE Cat. No.01CH37232)","volume":"235 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-06-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"59","resultStr":"{\"title\":\"Fast power/ground network optimization based on equivalent circuit modeling\",\"authors\":\"S. Tan, C. Shi\",\"doi\":\"10.1145/378239.379021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an efficient algorithm for optimizing the area of power or ground networks in integrated circuits subject to the reliability constraints. Instead of solving the original power/ground networks extracted from circuit layouts as previous methods did, the new method first builds the equivalent models for many series resistors in the original networks, then the sequence of linear programming method is used to solve the simplified networks. The solutions of the original networks then are back solved from the optimized, simplified networks. The new algorithm simply exploits the regularities in the power/ground networks. Experimental results show that the complexities of simplified networks are typically significantly smaller than that of the original circuits, which renders the new algorithm extremely fast. For instance, power/ground networks with more than one million branches can be sized in a few minutes on modern SUN workstations.\",\"PeriodicalId\":154316,\"journal\":{\"name\":\"Proceedings of the 38th Design Automation Conference (IEEE Cat. No.01CH37232)\",\"volume\":\"235 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-06-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"59\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 38th Design Automation Conference (IEEE Cat. No.01CH37232)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/378239.379021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 38th Design Automation Conference (IEEE Cat. No.01CH37232)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/378239.379021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 59

摘要

本文提出了一种基于可靠性约束的集成电路电源网或地网面积优化算法。该方法不像以前的方法那样求解从电路布置图中提取的原始电源/地网络,而是首先在原始网络中建立多个串联电阻的等效模型,然后使用序列线性规划法求解简化网络。然后从优化的、简化的网络中反求原始网络的解。新算法简单地利用了电源/地网络的规律。实验结果表明,简化后的网络复杂度明显小于原始电路的复杂度,这使得新算法的速度非常快。例如,在现代SUN工作站上,拥有超过100万个分支的电源/接地网络可以在几分钟内确定大小。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Fast power/ground network optimization based on equivalent circuit modeling
This paper presents an efficient algorithm for optimizing the area of power or ground networks in integrated circuits subject to the reliability constraints. Instead of solving the original power/ground networks extracted from circuit layouts as previous methods did, the new method first builds the equivalent models for many series resistors in the original networks, then the sequence of linear programming method is used to solve the simplified networks. The solutions of the original networks then are back solved from the optimized, simplified networks. The new algorithm simply exploits the regularities in the power/ground networks. Experimental results show that the complexities of simplified networks are typically significantly smaller than that of the original circuits, which renders the new algorithm extremely fast. For instance, power/ground networks with more than one million branches can be sized in a few minutes on modern SUN workstations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信