A. Abuhussein, M. Sadi, S. Alam
{"title":"配电系统中性点型GIC阻塞装置的优化配置","authors":"A. Abuhussein, M. Sadi, S. Alam","doi":"10.1109/td43745.2022.9816898","DOIUrl":null,"url":null,"abstract":"Bulk power systems have multiple transformers and grounded neutral points that allow geomagnetically induced currents (GICs) to enter power systems through them. GIC phenomenon has a very large footprint (continents) which makes it infeasible to install GIC Blocking Devices (BD) at all the grounded point. So, this paper proposes an algorithm that helps to optimize the placement position of the neutral based BDs, the algorithm is tested using MATLAB on a distribution system with 11 grounding points. From the simulation results, the algorithm is found to be prompt and efficient in minimizing the number of BDs installed and in stabilizing the system during an event of GIC.","PeriodicalId":241987,"journal":{"name":"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimal Placement of Neutral Based GIC Blocking Devices In Distribution Systems\",\"authors\":\"A. Abuhussein, M. Sadi, S. Alam\",\"doi\":\"10.1109/td43745.2022.9816898\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bulk power systems have multiple transformers and grounded neutral points that allow geomagnetically induced currents (GICs) to enter power systems through them. GIC phenomenon has a very large footprint (continents) which makes it infeasible to install GIC Blocking Devices (BD) at all the grounded point. So, this paper proposes an algorithm that helps to optimize the placement position of the neutral based BDs, the algorithm is tested using MATLAB on a distribution system with 11 grounding points. From the simulation results, the algorithm is found to be prompt and efficient in minimizing the number of BDs installed and in stabilizing the system during an event of GIC.\",\"PeriodicalId\":241987,\"journal\":{\"name\":\"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/td43745.2022.9816898\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/td43745.2022.9816898","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

大容量电力系统有多个变压器和接地中性点,允许地磁感应电流(gic)通过它们进入电力系统。GIC现象具有非常大的占地面积(大陆),这使得在所有接地点安装GIC阻塞装置(BD)是不可实现的。为此,本文提出了一种基于中性点的BDs放置位置优化算法,并在一个11个接地点的配电系统上进行了MATLAB测试。仿真结果表明,该算法能够快速有效地减少安装的bd数量,并在发生故障时稳定系统。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal Placement of Neutral Based GIC Blocking Devices In Distribution Systems
Bulk power systems have multiple transformers and grounded neutral points that allow geomagnetically induced currents (GICs) to enter power systems through them. GIC phenomenon has a very large footprint (continents) which makes it infeasible to install GIC Blocking Devices (BD) at all the grounded point. So, this paper proposes an algorithm that helps to optimize the placement position of the neutral based BDs, the algorithm is tested using MATLAB on a distribution system with 11 grounding points. From the simulation results, the algorithm is found to be prompt and efficient in minimizing the number of BDs installed and in stabilizing the system during an event of GIC.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信