{"title":"风力发电场krš-pađene对110 kV输电网可靠性指标的影响","authors":"S. Nikolovski, D. Topić, K. Fekete, G. Slipac","doi":"10.1109/EEM.2011.5953132","DOIUrl":null,"url":null,"abstract":"This paper presents the reliability assessment of the southern part of Croatian transmission network and the influence of the wind farm on reliability indices. Croatian Electric Utility (HEP) Renewable Energy Sources with partner C.E.M.P. is developing wind farm in the region near town Knin. Wind farm will have installed capacity of 100 MW in the first phase. In the second phase additional 40 MW is planned to be installed. For the purpose of this paper, it was assumed that wind farm consist of the 50 turbine units, 2 MW each. Reliability assessment was performed, and reliability indices were computed for the case before and after construction of the wind farm. The reliability is analyzed using state enumeration method and NEPLAN software. Input data were obtained from annual reports of HEP TSO (Transmission System Operator) and statistic analysis of data was performed first. Since there are no statistical data for new cables and transformer stations that are constructed, input data for them were taken from the relevant literature. Probability of wind farm production level is taken from measured wind statistics. In reliability assessment Markov state space model of the wind generator, busbars, transformers, breakers and disconectors was used. Load is modeled at the output substation busbars with maximum active and reactive power. The simulations are performed in order to calculate reliability indices before and after the construction of wind farm. Conclusions and comments on the results are presented at the end of the paper.","PeriodicalId":143375,"journal":{"name":"2011 8th International Conference on the European Energy Market (EEM)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"The influence of wind park krš-pađene on reliability indices of 110 kV transmission network\",\"authors\":\"S. Nikolovski, D. Topić, K. Fekete, G. Slipac\",\"doi\":\"10.1109/EEM.2011.5953132\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the reliability assessment of the southern part of Croatian transmission network and the influence of the wind farm on reliability indices. Croatian Electric Utility (HEP) Renewable Energy Sources with partner C.E.M.P. is developing wind farm in the region near town Knin. Wind farm will have installed capacity of 100 MW in the first phase. In the second phase additional 40 MW is planned to be installed. For the purpose of this paper, it was assumed that wind farm consist of the 50 turbine units, 2 MW each. Reliability assessment was performed, and reliability indices were computed for the case before and after construction of the wind farm. The reliability is analyzed using state enumeration method and NEPLAN software. Input data were obtained from annual reports of HEP TSO (Transmission System Operator) and statistic analysis of data was performed first. Since there are no statistical data for new cables and transformer stations that are constructed, input data for them were taken from the relevant literature. Probability of wind farm production level is taken from measured wind statistics. In reliability assessment Markov state space model of the wind generator, busbars, transformers, breakers and disconectors was used. Load is modeled at the output substation busbars with maximum active and reactive power. The simulations are performed in order to calculate reliability indices before and after the construction of wind farm. Conclusions and comments on the results are presented at the end of the paper.\",\"PeriodicalId\":143375,\"journal\":{\"name\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 8th International Conference on the European Energy Market (EEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2011.5953132\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 8th International Conference on the European Energy Market (EEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2011.5953132","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文介绍了克罗地亚南部输电网的可靠性评估及风电场对可靠性指标的影响。克罗地亚电力公司(HEP)可再生能源与合作伙伴ceemp正在克宁镇附近的地区开发风电场。第一阶段的风力发电场装机容量为100兆瓦。在第二阶段,计划再安装40兆瓦。为了本文的目的,假设风电场由50个涡轮机组组成,每个机组2mw。进行了可靠性评估,计算了风电场建设前后的可靠性指标。采用状态枚举法和NEPLAN软件对可靠性进行了分析。输入数据来源于输电系统运营商(HEP TSO)年度报告,首先对数据进行统计分析。由于新建电缆和变电站没有统计数据,因此输入数据来源于相关文献。风电场生产水平的概率由实测的风统计量得出。在可靠性评估中,采用了风力发电机、母线、变压器、断路器和断开器的马尔可夫状态空间模型。负载以最大有功功率和最大无功功率的输出变电所母线为模型。为了计算风电场建设前后的可靠性指标,进行了仿真计算。论文最后给出了结论和对研究结果的评论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The influence of wind park krš-pađene on reliability indices of 110 kV transmission network
This paper presents the reliability assessment of the southern part of Croatian transmission network and the influence of the wind farm on reliability indices. Croatian Electric Utility (HEP) Renewable Energy Sources with partner C.E.M.P. is developing wind farm in the region near town Knin. Wind farm will have installed capacity of 100 MW in the first phase. In the second phase additional 40 MW is planned to be installed. For the purpose of this paper, it was assumed that wind farm consist of the 50 turbine units, 2 MW each. Reliability assessment was performed, and reliability indices were computed for the case before and after construction of the wind farm. The reliability is analyzed using state enumeration method and NEPLAN software. Input data were obtained from annual reports of HEP TSO (Transmission System Operator) and statistic analysis of data was performed first. Since there are no statistical data for new cables and transformer stations that are constructed, input data for them were taken from the relevant literature. Probability of wind farm production level is taken from measured wind statistics. In reliability assessment Markov state space model of the wind generator, busbars, transformers, breakers and disconectors was used. Load is modeled at the output substation busbars with maximum active and reactive power. The simulations are performed in order to calculate reliability indices before and after the construction of wind farm. Conclusions and comments on the results are presented at the end of the paper.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信