基于BIM、3D打印机和物联网的市政公用隧道设施管理发展与应用场景

Chih-ming Wu, Qin Tsai, Lin-Yan Li, Celia Xiao
{"title":"基于BIM、3D打印机和物联网的市政公用隧道设施管理发展与应用场景","authors":"Chih-ming Wu, Qin Tsai, Lin-Yan Li, Celia Xiao","doi":"10.1109/ECICE50847.2020.9301944","DOIUrl":null,"url":null,"abstract":"In order to make the operation and maintenance phase of the utility tunnel more intelligent, this study is based on the building information modeling (BIM), 3D printing, IoT sensors, cloud computing and other technologies. The actual simulation of the utility tunnel in the operation stage. The results of the study learned that the use of the Internet of things and other technologies, will be able to more intelligent control of the use of the integrated management corridor, through cloud computing and other ways to reduce the advantages of cloud maintenance system set-up costs, increased efficiency in maintenance.","PeriodicalId":130143,"journal":{"name":"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Development and Application Scenario of Municipal Utility Tunnel Facility Management Based on BIM, 3D Printer and IoT\",\"authors\":\"Chih-ming Wu, Qin Tsai, Lin-Yan Li, Celia Xiao\",\"doi\":\"10.1109/ECICE50847.2020.9301944\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to make the operation and maintenance phase of the utility tunnel more intelligent, this study is based on the building information modeling (BIM), 3D printing, IoT sensors, cloud computing and other technologies. The actual simulation of the utility tunnel in the operation stage. The results of the study learned that the use of the Internet of things and other technologies, will be able to more intelligent control of the use of the integrated management corridor, through cloud computing and other ways to reduce the advantages of cloud maintenance system set-up costs, increased efficiency in maintenance.\",\"PeriodicalId\":130143,\"journal\":{\"name\":\"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ECICE50847.2020.9301944\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Eurasia Conference on IOT, Communication and Engineering (ECICE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECICE50847.2020.9301944","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

为了使公用隧道运维阶段更加智能化,本研究基于建筑信息模型(BIM)、3D打印、物联网传感器、云计算等技术。对水工隧洞运行阶段进行了实际模拟。研究结果了解到,利用物联网等技术,将能够更加智能地控制综合管理走廊的使用,通过云计算等方式降低云维护系统设置成本的优势,提高维护效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development and Application Scenario of Municipal Utility Tunnel Facility Management Based on BIM, 3D Printer and IoT
In order to make the operation and maintenance phase of the utility tunnel more intelligent, this study is based on the building information modeling (BIM), 3D printing, IoT sensors, cloud computing and other technologies. The actual simulation of the utility tunnel in the operation stage. The results of the study learned that the use of the Internet of things and other technologies, will be able to more intelligent control of the use of the integrated management corridor, through cloud computing and other ways to reduce the advantages of cloud maintenance system set-up costs, increased efficiency in maintenance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信