{"title":"FPGA软件测试流程管理","authors":"Wang Li, Zhou Hao","doi":"10.1109/GSIS.2015.7301927","DOIUrl":null,"url":null,"abstract":"FPGA software testing of ship domain is seriously lagging behind the growth rate of its application, in some fields it is not even included in the test category. In the product development process, the modification and debugging caused by FPGA software defect has become the bottleneck of schedule and cost. This paper gives a suitable test model and FPGA software testing process management system, according to the FGPA test situation and the Feature of the FPGA design. With standardized, orderly, systematic, engineering oriented, task oriented document and related management tools, the testing activities can provide correct guidance, organization and implementation, it can also be used for continuous improvement in all stages of the testing process, work quality and utility. Early discovery and closure the defects of FPGA in the development process, improve the efficiency of communication between FPGA designer and tester, can ultimately ensure quality of FPGA products, to improve customer satisfaction.","PeriodicalId":246110,"journal":{"name":"2015 IEEE International Conference on Grey Systems and Intelligent Services (GSIS)","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"FPGA software testing process management\",\"authors\":\"Wang Li, Zhou Hao\",\"doi\":\"10.1109/GSIS.2015.7301927\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"FPGA software testing of ship domain is seriously lagging behind the growth rate of its application, in some fields it is not even included in the test category. In the product development process, the modification and debugging caused by FPGA software defect has become the bottleneck of schedule and cost. This paper gives a suitable test model and FPGA software testing process management system, according to the FGPA test situation and the Feature of the FPGA design. With standardized, orderly, systematic, engineering oriented, task oriented document and related management tools, the testing activities can provide correct guidance, organization and implementation, it can also be used for continuous improvement in all stages of the testing process, work quality and utility. Early discovery and closure the defects of FPGA in the development process, improve the efficiency of communication between FPGA designer and tester, can ultimately ensure quality of FPGA products, to improve customer satisfaction.\",\"PeriodicalId\":246110,\"journal\":{\"name\":\"2015 IEEE International Conference on Grey Systems and Intelligent Services (GSIS)\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE International Conference on Grey Systems and Intelligent Services (GSIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/GSIS.2015.7301927\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE International Conference on Grey Systems and Intelligent Services (GSIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/GSIS.2015.7301927","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
FPGA software testing of ship domain is seriously lagging behind the growth rate of its application, in some fields it is not even included in the test category. In the product development process, the modification and debugging caused by FPGA software defect has become the bottleneck of schedule and cost. This paper gives a suitable test model and FPGA software testing process management system, according to the FGPA test situation and the Feature of the FPGA design. With standardized, orderly, systematic, engineering oriented, task oriented document and related management tools, the testing activities can provide correct guidance, organization and implementation, it can also be used for continuous improvement in all stages of the testing process, work quality and utility. Early discovery and closure the defects of FPGA in the development process, improve the efficiency of communication between FPGA designer and tester, can ultimately ensure quality of FPGA products, to improve customer satisfaction.